My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-06_GENERAL DOCUMENTS - M1996013
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1996013
>
2022-08-06_GENERAL DOCUMENTS - M1996013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 2:40:05 PM
Creation date
12/19/2024 2:16:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996013
IBM Index Class Name
General Documents
Doc Date
8/6/2022
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tamarisk (salt cedar) growth is pervasive throughout the disturbed areas, particularly on <br /> pit floors. <br /> Individual salt cedar plants will be cut as close to the ground as possible with chainsaws, <br /> and masticators, and herbicide such as Habitat, or equivalent, will be applied immediately <br /> thereafter to the perimeters of the cut stems. Approximately 12 acres (12 ac.) of <br /> tamarisk will require mastication and treatment. <br /> MEASUREMENT AND PAYMENT <br /> There will be no measurement for payment. Payment for this item will be reflected in a <br /> lump sum quote under Item 3.0 on the Bid Schedule. This lump sum quote will cover all <br /> costs for weed mowing and disposal including equipment, maintenance, and operator <br /> costs. Payment shall be made as this item is completed and approved by the PROJECT <br /> MANAGER and disposal receipts are provided. <br /> ITEM 4.0 GRADE ERIOSION FEATURES <br /> Erosion gullies were observed in two areas of the pit slopes, one on the central northeast- <br /> facing pit slope, and the other on the southern south-facing pit. The work will involve <br /> cutting and removing fill from the slopes and backfilling to fill the gullies to 3H:1V slopes. <br /> Check dams will also be created with on-site material to slow the flow of water in the <br /> backfilled gullies. Approximately seven hundred fifty cubic yards (750 CY) of fill will be <br /> required to fill the erosion features. Fill will be obtained on-site. No imported material is <br /> required. <br /> MEASUREMENT AND PAYMENT <br /> There will be no measurement for payment. Payment for this item will be reflected in a <br /> lump sum quote under Item 4.0 on the Bid Schedule. This lump sum quote will cover all <br /> costs for this item including equipment, maintenance, supplies and operator costs. <br /> Payment shall be made as this item is completed and approved by the PROJECT <br /> MANAGER. <br /> ITEM 5.0 REVEGETATE ALL DISTURBED AREAS <br /> Approximately 8 acres (8 ac.) will be fertilized and hand broadcast with a native seed <br /> mix. Seed will be incorporated mechnaically. Compacted areas, such as the access roads <br /> and barren areas, will be ripped prior to seeding. Approximately 1h mile of access road <br /> will be ripped and seeded. <br /> Seed will be supplied by the PROJECT MANAGER. Biosol Forte fertilizer will be applied <br /> at a rate of 1,000 Ibs per acre. Mulch is not required. <br /> MEASUREMENT AND PAYMENT <br /> Page 9 of 11 <br /> Rev. 7/15/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.