My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-06_GENERAL DOCUMENTS - M1996013
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1996013
>
2022-08-06_GENERAL DOCUMENTS - M1996013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 2:40:05 PM
Creation date
12/19/2024 2:16:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996013
IBM Index Class Name
General Documents
Doc Date
8/6/2022
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Deadline for all bids to be submitted is no later than 4:00 p.m. MT on Friday, <br /> September 9f", 2022. <br /> BID AWARD <br /> Award will be made with reasonable promptness, by written notice to the low responsive <br /> and responsible bidder whose bid meets the requirements and criteria set forth in the <br /> Invitation for bid. These criteria will include, but not be limited to the lowest GRAND <br /> TOTAL PRICE, corrected if necessary for errors in price extension and/or addition, on the <br /> Bidder's equipment if a List of Equipment Offered is required with the bid, and capability <br /> to meet the performance time requirements. The GRAND TOTAL PRICE will be used for <br /> comparing bids only. <br /> The bidder must be registered to do business in the State of Colorado with the <br /> Secretary of State www.sos.state.co.us. A Certificate of Good Standing will be required <br /> to process the Agreement. <br /> If Federal funds are utilized for this project, the contract cannot be awarded to a <br /> contractor which has been disbarred or suspended or is otherwise excluded from or <br /> ineligible for participation in federal assistance programs. The excluded parties list can <br /> be found at the following web site: http://www.sam.gov <br /> GENERAL BID SPECIFICATIONS <br /> The Colorado Inactive Mine Reclamation Program, General Bid Specifications 2009 <br /> which include General Conditions of the Contract, Standard Work Specifications, and <br /> Standard Drawings and Figures are intended to complement these Special Conditions. <br /> Please refer to the Standard Work Specifications for all applicable types of work <br /> required in the Special Conditions. The General Conditions of the Contract apply to all <br /> work covered in the Special Conditions. <br /> PROJECT DATES <br /> The project is scheduled for construction between September 15f", 2022 and October <br /> 15th, 2022. This includes ten (10) days mobilization time. These dates are tentative and <br /> may change. <br /> TIME OF COMPLETION <br /> The time of completion allowed for the project is (30) calendar days after receipt of the <br /> Notice to Proceed. This includes ten (10) days mobilization time. <br /> NOTICE OF AWARD AND EXECUTION OF DOCUMENTS <br /> Page 3 of 11 <br /> Rev. 7/15/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.