My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Cost Summary <br />Project Name: Cross and Caribou Reclamation Estimator <br />Project Date: November 23 2021 <br />Model Version: Version 1.4.1 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />F. Construction Management & Support Labor Equipment (2)Materials Total <br />Construction Management $34,693 $9,065 N/A $43,758 <br />Construction Support $0 $0 $0 $0 <br />Road Maintenance $0 $0 $0 $0 <br />Other User Costs (from Other User sheet)$0 $0 $0 $0 <br />Other**$0 <br />Subtotal "F"$34,693 $9,065 $0 $43,758 <br />Subtotal Operational & Maintenance Costs Labor (1)Equipment (2)Materials (3)Total <br />Subtotal A through F $90,026 $112,658 $31,731 $234,415 <br />** Other Operator supplied costs - additional documentation required. <br />11/21/2021 <br />Copyright © 2004 - 2008 <br />SRCE Software. All Rights Reserved. Page 2 of 3 11/21/2021 <br />I
The URL can be used to link to this page
Your browser does not support the video tag.