Laserfiche WebLink
Closure Cost Estimate <br />Cost Summary <br />Project Name: Cross and Caribou Reclamation Estimator <br />Project Date: November 23 2021 <br />Model Version: Version 1.4.1 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />A. Earthwork/Recontouring Labor (1)Equipment (2)Materials Total <br />Exploration $0 $0 $0 $0 <br />Exploration Roads & Drill Pads $0 $0 $0 $0 <br />Roads $3,948 $9,585 $0 $13,533 <br />Well Abandonment $0 $0 $0 $0 <br />Pits $0 $0 N/A $0 <br />Quarries & Borrow Areas $0 $0 $0 $0 <br />Underground Openings $7,064 $3,722 $13,267 $24,053 <br />Process Ponds $6,044 $12,383 $0 $18,427 <br />Heaps $0 $0 $0 $0 <br />Waste Rock Dumps $6,896 $19,986 $0 $26,882 <br />Landfills $0 $0 $0 $0 <br />Tailings $0 $0 $0 $0 <br />Foundation & Buildings Areas $3,276 $9,738 $0 $13,014 <br />Yards, Etc.$4,368 $12,984 $0 $17,352 <br />Drainage & Sediment Control $0 $0 $0 $0 <br />Generic Material Hauling $2,869 $7,881 $0 $10,750 <br />Other User Costs (from Other User sheet)$0 $0 $0 $0 <br />Other**$0 <br />Subtotal $34,465 $76,279 $13,267 $124,011 <br />Mob/Demob if included in Other User sheet $0 $0 $0 $0 <br />Mob/Demob $0 <br />Subtotal "A"$34,465 $76,279 $13,267 $124,011 <br />B. Revegetation/Stabilization Labor (1)Equipment (2)Materials Total <br />Exploration $0 $0 $0 $0 <br />Exploration Roads & Drill Pads $0 $0 $0 $0 <br />Roads $280 $100 $696 $1,076 <br />Well Abandonment N/A <br />Pits $0 $0 $0 $0 <br />Quarries & Borrow Areas $0 $0 $0 $0 <br />Underground Openings N/A <br />Process Ponds $700 $250 $685 $1,635 <br />Heaps $0 $0 $0 $0 <br />Waste Rock Dumps $280 $100 $793 $1,173 <br />Landfills $0 $0 $0 $0 <br />Tailings $0 $0 $0 $0 <br />Foundation & Buildings Areas $420 $150 $342 $912 <br />Yards, Etc.$940 $337 $6,548 $7,825 <br />Drainage & Sediment Control $0 $0 $0 $0 <br />Generic Material Hauling $140 $50 $114 $304 <br />Other User Costs (from Other User sheet)$0 $0 $0 $0 <br />Other**$0 <br />Subtotal "B"$2,760 $987 $9,178 $12,925 <br />C. Detoxification/Water Treatment/Disposal of Wastes**Labor (1)Equipment (2)Materials Total <br />Process Ponds/Sludge $0 <br />Heaps $0 <br />Dumps (Waste & Landfill) $0 <br />Tailings $0 <br />Surplus Water Disposal $0 <br />Monitoring $0 <br />Miscellaneous $0 <br />Solid Waste - On Site $905 $1,695 N/A $2,600 <br />Solid Waste - Off Site $0 <br />Hazardous Materials $0 <br />Hydrocarbon Contaminated Soils $0 $0 $0 $0 <br />Other User Costs (from Other User sheet)$0 $0 $0 $0 <br />Other**$0 <br />Subtotal "C"$905 $1,695 $0 $2,600 <br />Labor (1)Equipment (2)Materials Total <br />Foundation & Buildings Areas $2,639 $2,389 $0 $5,028 <br />Other Demolition $0 $0 $0 $0 <br />Equipment Removal $0 $0 $0 $0 <br />Fence Removal $2,241 $822 $3,063 <br />Fence Installation $1,137 $270 $7,980 $9,387 <br />Culvert Removal $1,938 $710 N/A $2,648 <br />Pipe Removal $2,144 $357 N/A $2,501 <br />Powerline Removal $0 $0 <br />Transformer Removal $0 $0 <br />Rip-rap, rock lining, gabions $0 $0 $0 $0 <br />Other Misc. Costs $0 $0 $0 $0 <br />Other User Costs (from Other User sheet)$0 $0 $0 $0 <br />Other**$0 <br />Subtotal "D"$10,099 $4,548 $7,980 $22,627 <br />Labor (1)Equipment (2)Materials Total <br />Reclamation Monitoring and Maintenance $7,104 $20,084 $1,306 $28,494 <br />Ground and Surface Water Monitoring $0 $0 $0 $0 <br />Other User Costs (from Other User sheet)$0 $0 $0 $0 <br />Subtotal "E"$7,104 $20,084 $1,306 $28,494 <br />E. Monitoring <br />D. Structure, Equipment and Facility Removal, and Misc. <br />11/21/2021 <br />Copyright © 2004 - 2008 <br />SRCE Software. All Rights Reserved. Page 1 of 3 11/21/2021 <br />I <br />I I I <br />I I I I <br />I <br />I <br />I