My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Waste DisposalProject Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Waste Disposal - Cost Summary <br />Labor Equipment Fees Totals <br />Solid Waste - On Site $905 $1,695 N/A $2,600 <br />Solid Waste - Off Site $0 <br />Hazardous Materials $0 <br />Hydrocarbon Contaminated Soils $0 $0 $0 $0 <br />TOTALS $905 $1,695 $0 $2,600 <br />Waste Disposal - Solid Waste Disposal <br /> <br />Description <br />(required) <br />Waste <br />Volume <br />Number <br />of Off Site <br />Dumpster <br />Loads <br />Landfill Fleet <br />Equipment <br />Landfill <br />Fleet <br />Productivity <br />Number of <br />Trucks <br />Total <br />Fleet <br />Hours <br />Total <br />Dumpster <br />Cost <br />Total <br />Labor <br />Cost <br />Total <br />Equipment <br />Cost <br />cy LCY/hr $$$ <br />1 Sediment (Pond 1)4 725/966G/D7R 6 1 1 $0 $181 $339 <br />2 Sediment (Pond 2)4 725/966G/D7R 6 1 1 $0 $181 $339 <br />3 Sediment (Pond 3A)2 725/966G/D7R 6 1 1 $0 $181 $339 <br />4 Sediment (Pond 3B)2 725/966G/D7R 6 1 1 $0 $181 $339 <br />5 Sediment (Pond 3C)4 725/966G/D7R 6 1 1 $0 $181 $339 <br />16 5 $0 $905 $1,695 <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 5 of 7 Waste Disposal <br />I <br />I
The URL can be used to link to this page
Your browser does not support the video tag.