Laserfiche WebLink
Closure Cost Estimate <br />Waste DisposalProject Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Waste Disposal - Cost Summary <br />Labor Equipment Fees Totals <br />Solid Waste - On Site $905 $1,695 N/A $2,600 <br />Solid Waste - Off Site $0 <br />Hazardous Materials $0 <br />Hydrocarbon Contaminated Soils $0 $0 $0 $0 <br />TOTALS $905 $1,695 $0 $2,600 <br />Waste Disposal - Assumptions & Calculations <br />Solid Waste Disposal <br />Off site disposal assumes use of average rolloff dumpster [30 cy (m3), 10 ton (tonne)] <br />On site disposal assumes use of small loader/truck fleet for haulage <br />Average density for on site disposal = 2,600 lb/cy (1,540 kg/m3) <br />For on site disposal only 1 truck is required unless total truck hours > 8, only 2 trucks unless total truck hours are > 16 <br />Hazardous Materials Disposal <br />Assumes all hazardous materials are known <br />Enter EITHER solid or liquid quantity each line. <br />If container type = 55 gallon (200 liter) drum then solid waste hauling costs apply <br />Average density for solids assumed to be 2,600 lb/cy (1,540 kg/m3) <br />Vacuum truck sizes: small = 2,200 gal (~8,300 litres), large = 5,000 gal (~19,000 litres) <br />Vacuum truck on site for 4 hours for each load <br />Hydrocarbon Contaminated Soils Disposal <br />Assumes all hazardous materials are known <br />On site disposal assumes biopad treatment <br />Exavation productivity =45 cy./hr (35 m3/hr) (Means Heavy Construction, 2006: 02315-424-0360) <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 4 of 7 Waste Disposal <br />I I <br />I I <br />I I