My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Process Ponds <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Process Ponds - Cost Summary <br />Labor Equipment Materials Totals <br />Backfilling Costs $1,554 $3,298 N/A $4,852 <br />Growth Media Placement Costs $2,975 $8,305 N/A $11,280 <br />Liner Cutting & Folding Costs $1,515 $780 N/A $2,295 <br />Subtotal Earthworks $6,044 $12,383 $0 $18,427 <br />Revegetation Costs $700 $250 $685 $1,635 <br />TOTALS $6,744 $12,633 $685 $20,062 <br />Process Ponds - User Input You must fill in ALL green cells and relevant blue cells in this section for each pond <br />Facility Description Pond Dimensions (1)Backfill - (If trucks are used) (1)Growth Media <br />Description <br />(required)ID Code <br />Pond <br />Length <br />Pond <br />Width <br />Pond <br />Depth <br />Pond <br />Sideslope <br />Angle <br />Disturbed <br />Area <br />(if calculated <br />elsewhere) <br />Percent <br />Backfill <br />Distance <br />from <br />Backfill <br />Borrow <br />Slope from <br />Facility to <br />Borrow Area <br />Pond Volume <br />(if calculated <br />elsewhere) <br />Growth Media <br />Thickness <br />Distance from <br />Growth Media <br />Stockpile <br />Slope from <br />Facility to <br />Stockpile <br />-1 ft ft ft _H:1V acres (100% if blank) ft % grade cy in ft % grade <br />1 Pond 1 54 28 6.0 67%300 16%24 22,704 -7% <br />2 Pond 2 113 61 8.0 75%275 0%24 22,704 -7% <br />3 Pond 3A 12 30 5.0 60%230 0%24 22,704 -7% <br />4 Pond 3B 15 35 6.0 67%260 -5%24 22,704 -7% <br />5 Pond 3C 32 40 10.0 80%215 -3%24 22,704 -7% <br />Notes: <br /> 1. All Physical parameters must be input even if manual overrides for volume or area are used. <br /> 2. If Slope from facility to borrow source is >20, downhill travel time may be underestimated due to limitation of uphill travel time curves and downhill speed tables from CAT Handbook (see Productivty Sheet) <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 1 of 6 Process Ponds <br />I I I I I
The URL can be used to link to this page
Your browser does not support the video tag.