Laserfiche WebLink
Closure Cost Estimate <br />Foundations & Buildings <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Buildings & Foundation Demolition Cost Summary <br />Labor Equipment Materials Totals <br />Building Demolition Cost $2,361 $1,667 N/A $4,028 <br />Wall Demolition Cost $0 $0 N/A $0 <br />Slab Demolition $278 $722 N/A $1,000 <br />Subtotal Demolition $2,639 $2,389 $0 $5,028 <br />Cover Placement Cost $3,276 $9,738 N/A $13,014 <br />Growth Media Placement Cost $0 $0 N/A $0 <br />Ripping/Scarifying Cost $0 $0 N/A $0 <br />Subtotal Earthworks $3,276 $9,738 $0 $13,014 <br />Revegetation Cost $420 $150 $342 $912 <br />TOTALS $6,335 $12,277 $342 $18,954 <br />Buildings & Foundation - User Input (cont.)You must fill in ALL green cells and relevant blue cells in this section for each building or facility <br /> Construction Materials Slab Demolition Foundation Cover Growth Media Revegetation <br />Description <br />(required)Building Type <br />Foundation Wall <br />Type <br />Slab Demo <br />Method <br />Slab <br />Breaking <br />Equipment <br />Fleet <br />Cover <br />Material Type <br />Cover <br />Placement <br />Equipment <br />Fleet <br />Maximum <br />Fleet Size <br />Growth Media <br />Material Type <br />Growth Media <br />Placement <br />Equipment <br />Fleet <br />Maximum <br />Fleet Size Seed Mix Mulch Fertilizer Scarify/ Rip?Ripping Fleet <br />(select)(select)(select)(select)(select)(select)(user override)(select)(select)(user override)(select)(select)(select)(select)(select) <br />1 Cross Snow Shed Sm. steel Block 4 in (100 mm) thick Break & bury Sm Excavator Stone - crushedSmall Truck Topsoil Small Truck Mix 4 Hydro Mulch None Yes Small Dozer <br />2 Flow Shed 1 Sm. wood Block 4 in (100 mm) thick Break & bury Sm Excavator Stone - crushedSmall Truck Topsoil Small Truck Mix 4 Hydro Mulch None Yes Small Dozer <br />3 Flow Shed 2 Sm. wood Block 4 in (100 mm) thick Break & bury Sm Excavator Stone - crushedSmall Truck Topsoil Small Truck Mix 4 Hydro Mulch None Yes Small Dozer <br />Notes: <br />1. Material Types are used for density correction based on material densities in Caterpillar Performance Handbook material density table <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 2 of 6 Foundations & Buildings <br />I I I I I I I I I I I I I I I I I I