My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Haul Material <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Generic Material Hauling - Cost Summary <br />Labor Equipment Materials Totals <br />Hauling/Crush/Screen/Compact $616 $1,287 N/A $1,903 <br />Cover Placement Cost $1,092 $3,246 N/A $4,338 <br />Topsoil Placement Cost $1,092 $3,246 N/A $4,338 <br />Ripping/Scarifying Cost $69 $102 N/A $171 <br />Subtotal Earthworks $2,869 $7,881 $0 $10,750 <br />Revegetation Cost $140 $50 $114 $304 <br />TOTALS $3,009 $7,931 $114 $11,054 <br />Generic Material Hauling - User Input (cont.) <br /> Hauling Material Cover Growth Media Revegetation <br />Description <br />(required) <br />Haul <br />Material Type <br />Material <br />Hauling <br />Fleet <br />Each <br />Fleet Size <br />(from/to crusher) <br />Compact <br />After <br />Placement? <br />Cover <br />Material Type <br />Cover <br />Placement <br />Equipment <br />Fleet <br />Maximum <br />Fleet Size <br />Growth <br />Media <br />Material <br />Type <br />Growth Media <br />Equipment <br />Fleet <br />Maximum <br />Fleet Size <br />Seed <br />Mix <br />Mulch <br />Type <br />Fertilizer <br />Type <br />Scarify/ <br />Rip? <br />Scarifying/ <br />Ripping Fleet <br />(select)(select) (user override)(select) (select) (user override) (select) (select) (user override) (select) (select) (select) (select) (select) <br />1 Idaho Tunnel Regrade Stone - crushedSmall Truck Yes Topsoil Small Truck Topsoil Small Truck Mix 4 Hydro Mulch None Yes Small Dozer <br />Notes: <br />1. Material Types are used for density correction based on material densities in Caterpillar Performance Handbook material density table <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 2 of 5 Haul Material <br />I I I I I <br />I I I I I I I I I I I I I I I I
The URL can be used to link to this page
Your browser does not support the video tag.