My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:24:26 AM
Creation date
12/17/2024 7:49:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Appendix L-1 2021 Reclamation Cost Calculation
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br />Waste Rock Dumps <br />Project Name: Cross and Caribou Reclamation Estimator - Reclamation Plan <br />Date of Submittal: November 23 2021 <br />File Name: RND2_Cross And Caribou Reclamation Cost Estimator_REVB.xlsm <br />Model Version: Version 1.4.1 <br />Cost Data: User Data <br />Cost Data File: SRCE_Cost_Data_File_1_12_Std_2020.xlsm <br />Cost Estimate Type: Surety Cost Basis: Northern Nevada <br />Waste Rock Dumps - Cost Summary <br />Labor Equipment Materials Totals <br />Grading Costs $207 $305 N/A $512 <br />Cover Placement Cost $4,367 $12,985 N/A $17,352 <br />Topsoil Placement Cost $2,184 $6,492 N/A $8,676 <br />Ripping/Scarifying Cost $138 $204 N/A $342 <br />Subtotal Earthworks $6,896 $19,986 $0 $26,882 <br />Revegetation Cost $280 $100 $793 $1,173 <br />TOTALS $7,176 $20,086 $793 $28,055 <br />Waste Rock Dumps - Scarifying/Revegetation Costs <br /> <br />Description <br />(required) <br />Slope <br />Area <br />Flat <br />Area <br />Total <br />Surface <br />Area <br />Final Slope <br />Length <br />Flat Area <br />Long <br />Dimension <br />Ripping/ <br />Scarifying <br />Fleet <br />Slope <br />Scarifying/ <br />Ripping <br />Hours <br />Flat Area <br />Scarifying/ <br />Ripping Hours <br />Scarifying/ <br />Ripping Labor <br />Costs <br />Scarifying/ <br />Ripping <br />Equipment <br />Cost <br />Total <br />Scarifying/ <br />Ripping Costs <br />Revegetation <br />Labor <br />Cost <br />Revegetation <br />Equipment <br />Cost <br />Revgetation <br />Material <br />Cost <br />Total <br />Revegetation <br />Cost <br />acres acres acres ft ft hrs hrs $$$$$$$ <br />1 Ore Storage 0.11 0.11 48 20 D7R 0 $69 $102 $171 $140 $50 $118 $308 <br />2 Waste Rock Storage 0.63 0.63 114 20 D7R 1 $69 $102 $171 $140 $50 $675 $865 <br />0.74 0.74 1 $138 $204 $342 $280 $100 $793 $1,173 <br />Notes:1) Minimum total ripping hours = 1 (i.e. If total ripping hrs (slope + flat) < 1, then one hour of fleet time is assumed, regardless of acres shown in in scarifying table.) <br />11/21/2021 <br />Copyright © 2004 - 2009 <br />SRCE Software. All Rights Reserved. Page 6 of 6 Waste Rock Dumps <br />I I I I I <br />I I I I I I I I I I I I I I I I
The URL can be used to link to this page
Your browser does not support the video tag.