Laserfiche WebLink
Cross Gold Mine <br />December 2024 U-2 <br /> <br /> <br />Table U-1. Environnemental Protection Facilities <br /> <br /> <br /> <br />Facility Maps & Figures Environmental Risk Protection <br />Measure <br />Status Construction <br />Schedule <br />Supporting <br />Documents & <br />Details <br />Non-fuel Chemical <br />storage <br />Map C-2 Spill and discharge of <br />chemicals <br />Plastic liners for <br />containment <br />Conceptual TBD Exhibit U, section <br />4 <br />Surface water control <br />measures <br />Map C-2 Stormwater carrying <br />sediment from <br />disturbed areas. <br />Diversion ditches; <br />Control berms <br />Designed 2025 Appendix G-1 <br />Monitoring wells Map C-2 & C-4 None-serves as <br />monitoring device <br />Groundwater wells <br />for monitoring <br />other EPF <br />Built N/A Appendix G-2 <br />Water lines Map C-2 Mine water <br />discharging to surface <br />water <br />Insulated pipes <br />buried. <br />Designed 2025 Exhibit U <br />Water ponds Map C-2 Surface water from <br />WRL discharging to <br />creek uncontrolled <br />Lined pond built at <br />WRL toe <br />Built (to be <br />modified) <br />2025 Exhibit U <br />Water treatment <br />facility <br />Map C-2 Stored water <br />discharge to surface <br />water <br />CONEX holding <br />water systems <br />Designed 2025 Appendix G-2 <br />Surface Ore Stockpile <br />Facility <br />Map C-2A Discharge of <br />ore/water that has <br />contacted ore to <br />surface water <br />Building with <br />internal lip to <br />prevent discharge <br />Conceptual 2025 Exhibit C, Section <br />6, Exhibit U, <br />Section 4; Future <br />TR