My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:20:14 AM
Creation date
12/17/2024 7:47:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Table of Contents, Introduction Exhibit A Thru Exhibit U Appendix A Thru Appendix G
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cross Gold Mine <br />December 2024 E-4 <br /> <br /> <br /> <br />There are currently two ventilation shafts, one shaft, one adit, and two portals that will require closure <br />as listed in Table E-2. All shafts, adits, portals, and ventilation shafts will be closed according to the <br />Colorado Inactive Mine Program standards and specifications (DRMS 2009). <br />Table E-2. Shafts and Portals <br />Name Size (feet) <br />Cross Mine Adit 8x8 <br />Idaho Tunnel Portal 12x12 <br />Caribou Level 300 Portal 8x8 <br />Potosi Shaft 6x6 <br />Cross Ventilation Shaft and Escapeway 10x5 <br />Cross Ventilation Shaft 5x5 <br /> Cross Mine Adit <br />The Cross Mine Adit will be closed using the concrete block wall closure shown in Figure 1 of Appendix <br />E-1. Concrete blocks will be 8x8x16. The Cross Mine Adit closure is estimated to be 8 x 8 feet in <br />vertical and horizontal dimension (Sections A and B in Figure 1 of Appendix E-1). The snowshed will be <br />removed prior to closure and the materials recycled or disposed of according to the reclamation plan <br />(Section 1.1). The adit closure will be fenced with a 5x5 foot chain link fence and will be posted for <br />hazard and trespass. Approximately 25 square feet will be revegetated. <br /> Idaho Tunnel Portal <br />The Idaho Tunnel Portal will be closed using the concrete block wall closure shown in Figure 1 of <br />Appendix E-1. Concrete blocks will be 8x8x16. The Idaho Tunnel portal closure is estimated to be 12 x <br />12 feet in vertical and horizontal dimension (Sections A and B in Figure 1 of Appendix E-1). The <br />snowshed will be removed prior to closure and the materials recycled or disposed of according to the <br />reclamation plan (Section 1.1). A 2 x 2 x 0.25-foot grated access door will be installed that will be used <br />in the block wall to provide for water inspection. The portal closure will be fenced with a 50-foot chain <br />link fence and posted for hazard and trespass. Approximately 25 square feet will be revegetated. The <br />Idaho Tunnel slope has a horizontal area of approximately 0.147 acres and a slope surface of <br />approximately 0.178 acres. Based on the results of the slope analysis described in the approved <br />Technical Revision (TR) No. 9, which indicates that the slope is stable, the slope surface will be graded <br />to approximate original contour with a slope no greater than 2:1 using materials left from historic and <br />current operations. If conditions change (bulkhead addition or other conditions), additional slope <br />evaluation may be required in the future and would be provided to DRMS as a TR. GIR anticipates <br />using a DR7 (or equivalent bulldozer) to regrade the slope. The area (approximately 0.178 acres) will <br />be covered with 1 foot of topsoil in accordance with Section 1.10. Topsoil will be graded using a DR7 <br />(or equivalent bulldozer). Topsoil will come from disturbance associated with diversion structure <br />installation and the construction of the Caribou Access Road. Revegetation will be in accordance with <br />Section 1.11. Seed will be used to provide a vegetative cover that is consistent with the DRMS Inactive
The URL can be used to link to this page
Your browser does not support the video tag.