My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:20:14 AM
Creation date
12/17/2024 7:47:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Table of Contents, Introduction Exhibit A Thru Exhibit U Appendix A Thru Appendix G
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cross Gold Mine <br />December 2024 E-1 <br /> <br /> <br />Exhibit E Reclamation Plan <br />1. RE CLAMATION PLAN <br />This is an underground mining operation. Once underground mining is complete and the surface <br />facilities are no longer needed, the affected mine site surface areas (Exhibit D, Section 1.1) will be <br />reclaimed within the five-year period. The Cross Mine will be reclaimed in accordance with DRMS <br />permit requirements and Section 3 of the Reclamation Performance Standards (Section 3.1, Hard <br />Rock, Metal, and Designated Mining Operations (Colorado Mined Land Reclamation Board 2019) as <br />described below. Map F-1 shows the reclaimed conditions of the site. <br />Year one reclamation will begin with removal of facilities, debris, and other materials (Exhibit D, Section <br />1.1) that would interfere with revegetation. Water, sediment, and liners will be removed from the ponds. <br />Reclamation areas will be graded and prepared for revegetation. If time allows during the first year of <br />reclamation, the reclamation sites will be revegetated. Revegetation may need to wait for year two. In <br />year two, shafts and portals will be closed and fenced. During year three, all remaining reclamation <br />activities that have not been completed, will be. GIR does not anticipate reclamation past year three. <br />The post-mining land use will be Forestry in accordance with Boulder County (BOCO) regulations <br />(Appendix M-2) and as approved by DRMS in 1999 (DRMS Record REV08755) and BOCO (DRMS <br />Record REV201670) and in 2012, BOCO approved building retention following reclamation (Appendix <br />M-2) as. Reclamation activities described in this plan are directed toward this future use on what is <br />private land. The existing private residence (historic cabin) will be retained on site. No substitute lands <br />are proposed for reclamation. No structural fill will be imported. <br />The site components that will be reclaimed include the following: <br />Table E-1. Site Components for Reclamation <br />Site Component Square Feet Approximate Acres <br />Cross Mine Adit 64 0.0014 <br />Cross Ventilation Shaft and Escapeway 64 0.0014 <br />Cross Ventilation Shaft 36 0.0008 <br />Idaho Tunnel Portal 144 0.0033 <br />Caribou 300 Level Portal 64 0.0014 <br />Potosi Shaft 36 0.0008 <br />Waste Rock Landform 12068 0.2770 <br />Pond 1 2004 0.0460 <br />Pond 2 8285 0.1902 <br />Ponds 3A, 3B, 3C 8636 0.1982 <br />New Roadway between Cross and Caribou Mines 28465 0.6534 <br />Disturbed Hillside Around Idaho Tunnel Portal 6417 0.1473 <br />Roadway from USFS Road 505 to Snowshed Door at Caribou 300 Level Portal 300 0.0068
The URL can be used to link to this page
Your browser does not support the video tag.