My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-12-16_REVISION - M1977410
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977410
>
2024-12-16_REVISION - M1977410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 10:20:14 AM
Creation date
12/17/2024 7:41:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
Revision
Doc Date
12/16/2024
Doc Name Note
Table of Contents, Introduction Exhibit A Thru Exhibit G Appendix A Thru Appendix F
Doc Name
Request For Conversion
From
Grand Island Resources LLC
To
DRMS
Type & Sequence
CN1
Email Name
JPL
JLE
EL1
LJW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cross Gold Mine <br />December 2024 D-8 <br /> <br /> <br />consistently low metal loading and pH levels in the range of 6.4 to 7.6. See Exhibit U for chemistry data <br />and discussion. <br />GIR will comply with all applicable groundwater standards established by the Water Quality Control <br />Commission. Appropriate water treatment is being provided via the water treatment system sufficient to <br />meet applicable water quality discharge standards, as specified in our CDPES permit. The new water <br />system will continue the water treatment processes in a more robust and weather resistant manner. <br />7. Ore Processing <br />Future ore processing at the Cross Gold Mine will be contingent upon the approval of a fully designed <br />milling and tailings storage program. The permittee is currently evaluating paste backfill technology to <br />support the containment of tailings within the mine’s historic workings. After laboratory-scale testing is <br />completed, a comprehensive tailings storage proposal, along with the final mill design, will be submitted <br />to the Colorado Division of Reclamation, Mining, and Safety (CDRMS). Until these designs and <br />programs have been reviewed and approved, no ore processing activities will be conducted at the <br />Cross Gold Mine. <br /> <br />Throughout the operational life of the Cross Gold Mine, all ore will be stored inside the designated ore <br />building (see Map C-2). No geological or geochemical conditions are anticipated to impact the ore <br />building’s function as an Environmental Protection Facility (EPF), nor is its operation expected to <br />influence such conditions. The location of the ore building is provided on the Exhibit C maps. <br /> <br />There is no mill or tailings storage currently onsite. GIR is developing a mill for future installation and <br />will provide full design details as part of a technical revision to CDRMS. Tailings disposal will also be <br />addressed in a technical revision with the full mill design. <br />A conceptual mill layout can be seen in the Exhibit C maps and Figure D-1 shows a conceptual flow <br />chart of the milling process that is anticipated. These concepts are provided for the benefit of CDRMS <br />and the public to understand fully the long-term plans at the Cross Gold Mine. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.