Laserfiche WebLink
Scraper Worksheet Cont’d Task # 006 Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br /> <br />Task description: 3 Ft Clay Liner Protective Cover Site: Lyons Quarry Permit Action: 2024 Cost Est Permit/Job#: M1977208 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 2/14/2024 County: Boulder Filename: M208-006 <br />User: JPL Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 10,000 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA 50 20 <br />Ownership cost/hour: $281.32 NA NA NA $179.39 $111.67 <br />Operating cost/hour: $319.35 NA NA NA $59.82 $23.69 <br />%Utilization-ripper: NA NA NA NA 0 NA <br />Ripper own. cost/hour: NA NA NA NA $5.75 $0.00 <br />Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br />Operator cost/hour: $57.52 NA NA NA $56.70 $0.00 <br />Unit Subtotals: $658.19 NA NA NA $301.66 $135.36 <br />Number of Units: 6 0 0 0 1 1 <br />Group Subtotals: Work: $3,949.14 Support: $0.00 Maint: $437.02 Total work team cost/hour: $4,386.16 <br /> <br />MATERIAL QUANTITIES Initial volume: 34,426 CCY Swell factor: 1.220 <br />Loose volume: 42,000 LCY Source of estimated volume: Operator Second Submittal Table 6 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION Scraper Bowl (volume) Basis: Material weight: 2,800 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Clay - Natural bed Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 29.14 LCY Adjusted Capacity: 29.00 LCY <br />