My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-21_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2023-12-21_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 10:14:27 AM
Creation date
12/2/2024 9:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
12/21/2023
Doc Name Note
Reclamation Cost Estimate
Doc Name
Reclamation Cost Update
From
DRMS
To
CEMEX
Type & Sequence
CT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont’d Task # 006 Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br /> <br />Task description: 3 Ft Clay Liner Protective Cover Site: Lyons Quarry Permit Action: 2024 Cost Est Permit/Job#: M1977208 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 006 State: Colorado Abbreviation: None <br />Date: 2/14/2024 County: Boulder Filename: M208-006 <br />User: JPL Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 10,000 Gal. <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA 50 20 <br />Ownership cost/hour: $281.32 NA NA NA $179.39 $111.67 <br />Operating cost/hour: $319.35 NA NA NA $59.82 $23.69 <br />%Utilization-ripper: NA NA NA NA 0 NA <br />Ripper own. cost/hour: NA NA NA NA $5.75 $0.00 <br />Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br />Operator cost/hour: $57.52 NA NA NA $56.70 $0.00 <br />Unit Subtotals: $658.19 NA NA NA $301.66 $135.36 <br />Number of Units: 6 0 0 0 1 1 <br />Group Subtotals: Work: $3,949.14 Support: $0.00 Maint: $437.02 Total work team cost/hour: $4,386.16 <br /> <br />MATERIAL QUANTITIES Initial volume: 34,426 CCY Swell factor: 1.220 <br />Loose volume: 42,000 LCY Source of estimated volume: Operator Second Submittal Table 6 <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION Scraper Bowl (volume) Basis: Material weight: 2,800 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Clay - Natural bed Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 29.14 LCY Adjusted Capacity: 29.00 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.