My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-21_REVISION - M1977208
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2023-12-21_REVISION - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 10:14:27 AM
Creation date
12/2/2024 9:27:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
12/21/2023
Doc Name Note
Reclamation Cost Estimate
Doc Name
Reclamation Cost Update
From
DRMS
To
CEMEX
Type & Sequence
CT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont’d Task # 004 Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br /> <br /> <br /> <br />Cycle Time: Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes Job Condition Correction: Site Altitude: 5200 feet <br /> Scraper Push Dozer Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br /> <br />Net Correction: <br /> <br />0.830 <br /> <br />0.830 Travel Time: <br /> Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) <br />1 500.00 1.00 2.00 3.00 2800 0.46 Haul Time: 0.46 minutes Return Route: <br />Seg # Haul Distance (Ft) Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel Time (min) <br />1 500.00 -2.00 2.00 0.00 2965 0.27 Return Time: 0.27 minutes Total Scraper team cycle time: 2.33 minutes <br />Adjusted for job conditions: 1,239.66 LCY/Hour <br />Selected Number of Scrapers: 6 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 3,718.97 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 3,718.97 LCY/Hour Unadjusted unit production/hour: 1,493.56 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br /> <br />JOB TIME AND COST Fleet size: 1 Team(s) Total job time: 83.35 Hours <br /> <br />Unit cost: <br /> <br />$1.240 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$384,267 <br />
The URL can be used to link to this page
Your browser does not support the video tag.