My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:26:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Rute 6.5 Geotechincal Stability Exhibit
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ity,water flow,and environmental impact. By thoroughly understanding the site's existing conditions,the following benefits <br /> will be achieved: <br /> • Improved Slope Stability: Slope profiles and potential weak spots will be identified,allowing for the design of appropri- <br /> ate slope angles and reinforcement measures to prevent collapse or erosion during mining. <br /> • Enhanced Drainage Planning: By understanding how water naturally flows across the site,drainage systems can be <br /> strategically placed to avoid pooling and erosion,while also preventing surface runoff from entering mining pits. <br /> Better Reclamation Planning: Pre-mining surface data will be critical in developing post-mining reclamation plans, <br /> ensuring that disturbed areas are restored to their original or improved condition once mining activities are complete. <br /> 4.4 Ongoing Monitoring <br /> The pre-mining survey will establish benchmarks for ongoing monitoring throughout the mining lifecycle.These bench- <br /> marks will be used for: <br /> • Tracking Changes:Continuous or periodic surveys will be conducted to compare post-mining surface conditions with <br /> pre-mining data,ensuring that mining activities remain within planned parameters and identifying any early signs of <br /> instability. <br /> • Adapting Operations: If any unforeseen changes in slope stability or water flow are detected,the operation can be <br /> quickly adapted to mitigate potential hazards,ensuring worker safety and environmental protection. <br /> By conducting a thorough pre-mining surface survey,the West Side Placer Project will ensure that its operations are <br /> grounded in accurate,reliable data,leading to safer,more efficient mining and reducing the likelihood of environmen- <br /> tal impact. <br /> 6 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.