Laserfiche WebLink
EXHIBIT L <br /> This budget ensures that the West Side Placer Project adheres to all regulatory standards and achieves reclamation goals <br /> effectively,reflecting our commitment to environmental stewardship and community welfare. <br /> (B) Reclamation Cost Table <br /> This section provides a detailed breakdown of the anticipated costs associated with the reclamation of the West Side Placer <br /> Project,organized into direct and indirect costs. Direct costs relate specifically to on-the-ground activities required to <br /> restore the site post-mining operations,while indirect costs cover the administrative and oversight aspects necessary to <br /> ensure the success of these efforts. <br /> Task/Description Equipment Used Cost <br /> C.1 Borehole Removal x4 Borehole $10,060.80 <br /> C.2 Plant Foundation Demolition Excavator $22,750 <br /> C.3 Ore and Overburden Replacement From Mining Phases Scraper $54,797.57 <br /> CA Grading of Mining Phase Dozer $5,608.48 <br /> C.5 Topsoil Replacement From Mining Phases Scraper $41,525.11 <br /> C.6 Ripping Compacted Areas Ripper $19,532.12 <br /> C.7 Seed Mining Phases Re-vegetation Equipment $71,993.74 <br /> Total $226,267.82 <br /> Indirect Costs <br /> Liability Insurance: $6,728.48 <br /> Job Superintendent: $21,110.30 <br /> C.8 Monitoring Site and Reseeding-5 years $22,608.30 <br /> Total Indirect Costs $50,447.08 <br /> Reclamation Total <br /> Total $276,714.90 <br /> 86 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />