My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-27_REVISION - M2016081 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2024-11-27_REVISION - M2016081 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2024 9:10:12 AM
Creation date
12/2/2024 8:21:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
11/27/2024
Doc Name Note
Exhibit A-S
Doc Name
Request For Conversion
From
AuPt Industries LLC
To
DRMS
Type & Sequence
CN2
Email Name
HR1
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> This budget ensures that the West Side Placer Project adheres to all regulatory standards and achieves reclamation goals <br /> effectively,reflecting our commitment to environmental stewardship and community welfare. <br /> (B) Reclamation Cost Table <br /> This section provides a detailed breakdown of the anticipated costs associated with the reclamation of the West Side Placer <br /> Project,organized into direct and indirect costs. Direct costs relate specifically to on-the-ground activities required to <br /> restore the site post-mining operations,while indirect costs cover the administrative and oversight aspects necessary to <br /> ensure the success of these efforts. <br /> Task/Description Equipment Used Cost <br /> C.1 Borehole Removal x4 Borehole $10,060.80 <br /> C.2 Plant Foundation Demolition Excavator $22,750 <br /> C.3 Ore and Overburden Replacement From Mining Phases Scraper $54,797.57 <br /> CA Grading of Mining Phase Dozer $5,608.48 <br /> C.5 Topsoil Replacement From Mining Phases Scraper $41,525.11 <br /> C.6 Ripping Compacted Areas Ripper $19,532.12 <br /> C.7 Seed Mining Phases Re-vegetation Equipment $71,993.74 <br /> Total $226,267.82 <br /> Indirect Costs <br /> Liability Insurance: $6,728.48 <br /> Job Superintendent: $21,110.30 <br /> C.8 Monitoring Site and Reseeding-5 years $22,608.30 <br /> Total Indirect Costs $50,447.08 <br /> Reclamation Total <br /> Total $276,714.90 <br /> 86 <br /> HARDROCK/METAL MINING REGULAR(112)APPLICATION Au Pt Industries LLC I PO Box 1424-Edwards,Colorado 81632 1970 306 1 784 <br />
The URL can be used to link to this page
Your browser does not support the video tag.