Laserfiche WebLink
Hukill Gulch Millsite <br />TC2 Adequacy Review 1 <br />Page 2 of 2 <br /> <br /> <br />The three items noted above will need to be addressed to the Division’s satisfaction before scheduling a <br />hearing before the MLRB for the consideration of your request for a second period of temporary cessation. <br />Notice of that hearing will be sent under separate correspondence. <br /> <br />The Division currently holds a financial warranty in the amount of $107,742.72. The Division conducted <br />an inspection on September 13, 2024. Following the inspection, the Division evaluated the reclamation <br />liability and determined the currently held bond is adequate to reclaim the site. <br /> <br />If you have any questions, please contact me at the Division of Reclamation, Mining and Safety, 1313 <br />Sherman Street, Room 215, Denver, CO 80203, by telephone at 720-527-1640 or by email at <br />nikie.gagnon@state.co.us. <br /> <br /> <br />Sincerely, <br /> <br /> <br />Nikie Gagnon <br />Environmental Protection Specialist <br /> <br />EC: Mason Drake, Venture Gold, Inc. <br /> Jared Ebert, Sr. EPS, DRMS <br /> <br /> <br /> <br /> <br />