Laserfiche WebLink
ASCI Turnpike Mining Resources SWSP Page 5 of 9 <br /> November 25, 2024 <br /> 33.10 acre-feet. Total consumption at the Turnpike Mining Resource site must not <br /> exceed these aforementioned amounts unless an amendment is made to this SWSP. <br /> 4. Approval of this SWSP is for the purposes as stated herein. This office must first <br /> approve any additional uses for the water. Any future additional historical <br /> consumptive use credit given (e.g., agricultural water transfer) for this site must <br /> consider all previous credits given. <br /> 5. The replacement water that is the subject of this SWSP cannot be sold or leased to <br /> any other entity. As a condition of subsequent renewals of this SWSP, the <br /> replacement water must be appurtenant to this site until a plan for augmentation is <br /> obtained. All replacement water must be concurrent with depletions in quantity, <br /> timing, and locations. <br /> 6. The Applicant shall provide daily accounting (including, but not limited to diversions, <br /> depletions, replacement sources, and river calls) on a monthly basis. The accounting <br /> must be uploaded to the CDSS Online Reporting Tool within 30 days of the end of the <br /> month for which the accounting applies (https://dwr.state.co.us/Tools/reporting). <br /> Instructions for using the tool are available on the Division of Water Resources <br /> website on the "Services" --* "Data Et Information" page under the heading of Online <br /> Data Submittal. Accounting and reporting procedures are subject to approval and <br /> modification by the Division Engineer. Accounting forms need to identify the WDID <br /> number for each structure operating under this SWSP. Additional information <br /> regarding accounting requirements can be found in the attached Augmentation Plan <br /> Accounting Protocol. NOTE: Monthly accounting, even during the winter non-irrigation <br /> season, is required. <br /> In addition, the Applicant shall verify that the entity making replacements has <br /> included the Applicant on their accounting and submitted their accounting to the <br /> Division Office and the Water Commissioner. For this SWSP, that entity is the City of <br /> Erie. <br />