Laserfiche WebLink
ASCI Turnpike Mining Resources SWSP Page 4 of 9 <br /> November 25, 2024 <br /> Replacements <br /> Replacement water will be obtained through leasing fully consumable replacement water <br /> from the Town of Erie ("Erie"). According to the lease dated November 5, 2024 between Erie <br /> and the Applicant, Erie will lease 35.60 acre-feet of effluent derived from Erie's Windy Gap <br /> Project Units obtained from the Northern Water Conservancy District to be delivered during <br /> this SWSP period. Such water will be delivered to the Town of Erie's North Water <br /> Reclamation Facility (WDID 0602308) where it discharges to Boulder Creek. The Town of <br /> Erie's North Water Reclamation Facility is located in Section 31, Township 2 North, Range 68 <br /> West, 61" P.M., therefore no transit losses are assessed for this replacement source. <br /> Conditions of Approval <br /> This SWSP is herby approved in accordance with section 37-90-137(11), C.R.S., subject to <br /> the following conditions: <br /> 1. This SWSP shall be valid for the period of January 1, 2025 through December 31, <br /> 2025, unless otherwise revoked or superseded by decree. If this plan will not be made <br /> absolute by a water court action by the plan's expiration date, a renewal request <br /> must be submitted to this office with the statutory fee (currently $257), with all <br /> necessary leases and other supporting documentation, no later than November 1, <br /> 2025. If a renewal request is received after the expiration date of this plan, it may be <br /> considered a request for a new SWSP and the $1,593 filing fee will apply. <br /> 2. Well Permit 89056-F has been issued for this pit, in accordance with section 37-90- <br /> 137(2), C.R.S. The permit covers up to 16 acres of exposed surface area and allows for <br /> annual water uses of up to 48 acre-feet for evaporation losses, dewatering, water lost <br /> with mined product, and dust control. Actual depletions cannot exceed these amounts <br /> and are limited to those uses specifically approved through this SWSP. <br /> 3. The total surface area of the groundwater exposed at the Turnpike Mining Resource <br /> site must not exceed an area of 13.23 acres which results in an annual depletion of <br />