Laserfiche WebLink
M-2023-043 <br /> Seeley Reservoir Stockpiles <br /> Exhibit G— Water Information <br /> There are no water rights associated with the project area. <br /> The stockpiles of sediment are not expected to encounter groundwater as they are not being set <br /> below grade. Removal of the materials is occurring from surface water.A sediment basin has <br /> been engineered to filter water from the southern stockpile area to prevent the migration of <br /> sediment off site.No additional treatment measures are expected for the operation. <br /> Removal of the sediment from the Seeley Reservoir inlet is required to maintain the reservoirs <br /> required water allotment to their shareholders. The nearest body of water for the stockpile areas <br /> is Seeley Reservoir and flows are expected to go towards the reservoir. <br />