My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-12_REVISION - M2008076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008076
>
2024-11-12_REVISION - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 7:17:11 AM
Creation date
11/12/2024 2:29:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
Revision
Doc Date
11/12/2024
Doc Name Note
Revised
Doc Name
Returned Mail
From
DRMS
To
Daniel Robinson - Robinson Son Inc.
Type & Sequence
SI2
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#008 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: TRINIDAD <br /> Total one-way travel distance: 23.00 miles <br /> Average Travel Speed: 55.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $6,511.16 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $249.21 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.42 0.42 <br /> Return Time(Hours): 0.42 0.42 <br /> Loading Time(Hours): 0.83 NA <br /> Unloading Time(Hours): 0.83 NA <br /> Subtotals: 2.50 0.84 <br /> JOB TIME AND COST <br /> Total job time: 4.99 Hours <br /> Total job cost: $6,760 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.