My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-11-12_REVISION - M2008076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008076
>
2024-11-12_REVISION - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2024 7:17:11 AM
Creation date
11/12/2024 2:29:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
Revision
Doc Date
11/12/2024
Doc Name Note
Revised
Doc Name
Returned Mail
From
DRMS
To
Daniel Robinson - Robinson Son Inc.
Type & Sequence
SI2
Email Name
AMG
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization/Demobilization <br /> Robinson Sons Gravel Pit No. Permit Action: <br /> Site: 1 2024 ReCalc Permit/Job#: M2008076 <br /> PROJECT IDENTIFICATION <br /> Task#: 008 State: Colorado Abbreviation: None <br /> Date: 10/4/2024 County: Las Animas Filename: 8 <br /> User: AMG <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $10.44 $22.18 $23.94 <br /> Operating Cost/Hour: $26.48 $54.55 $55.65 <br /> Operator Cost/Hour: $22.52 $22.52 $22.52 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: 1 $59.44 $122.78 1 $125.64 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> TONS t fleet <br /> Cat D8T-8SU 47.71 $173.32 $122.78 2 $592.20 $245.56 $500.00 <br /> Drill/Broadcast 25.00 $41.02 $59.44 2 $200.92 $118.88 $500.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $27.21 $59.44 1 $86.65 $59.44 $250.00 <br /> Bowie LD-90 <br /> Subtotals: 1 $879.77 $423.88 $1,250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4,3/4 T. $119.71 1 $119.71 $119.71 <br /> Fuel Tanker,4x2 170 HP $55.22 1 $55.22 $55.22 <br /> Water Tanker,5,000 Gal. $123.04 1 $123.04 $123.04 <br /> Subtotals: $297.97 $297.97 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.