Laserfiche WebLink
power plant (Ash Pit). Reclamation at the Trapper Mine continues as the mining of pits progresses <br /> eastward. On active mine areas, backfilling and grading, topsoil redistribution and seeding occur <br /> contemporaneously. <br /> IL SUMMARY OF THE BOND RELEASE PROCESS <br /> History of Previous Bond Release Submittals <br /> The Division approved a full release of reclamation <br /> liability for the Craig Generation Plant Loadout in <br /> December 1985. That approval was for release of <br /> reclamation liability only. No money was returned; <br /> that is, there was no reduction in the amount of <br /> m tea. <br /> actual bond monies held by the Division. <br /> Other bond release submittals (SLO1 through SL24) <br /> are summarized in Table 1 and include a historyof <br /> -� associated liability reductions requested by TMI. <br /> None of the prior bond releases resulted in an <br /> immediate change in the amount of actual bond <br /> monies held by the Division. TMI has redisturbed <br /> reclaimed acres over the years. TMI provides a <br /> « � summary of the redisturbance acres in Table 1.2 of <br /> their annual reclamation reports. The re- <br /> disturbance noted in Table 1 takes into account re- <br /> disturbance acres through 2023. <br /> Photo]: Drone panel for data collection in <br /> Darringer Pit. <br /> Permit Number C1981010 Prepared by: R.Reilley <br /> SL25 Page 3 of 21 <br />