Laserfiche WebLink
------------------- ------------ --- ----------------------------------------------------------------- ----------------------------------------- <br /> Map 1: The ]],200 acre Trapper Mine permit boundary and the area's typical pre-mine dendritic drainage pattern. <br /> The specific sections applicable to the Phase I bond release request comprise: <br /> o TSN, R91W Portions of Sections 3 and 2. <br /> o T6N, R91W Portion of Section 27, 28 and 34. <br /> The bond release blocks requested in the above legal description include areas of the Daringer (D), <br /> Enfield (E) and Ithica(I) pits characterized by range sites A, B and C. vegetation types. <br /> Land and Coal Ownership <br /> The ownership of the land for which bond release has been requested is state and private, and the coal <br /> ownership mined was federal and state. <br /> Summary of Current Activities at Trapper Mine <br /> Trapper Mine is an active mine with six pits: A, D, E, I, J, L and N (Ashmore, Derringer, Enfield, <br /> Ithica, Jennings, Lancaster and Nighthawk), where TMI actively mines coal or is implementing <br /> reclamation and includes pits approved to receive coal combustion residues from the Craig Station <br /> Permit Number C1981010 Prepared by: R.Reilley <br /> SL25 Page 2 of 21 <br />