Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Backfill pits <br /> Site: Alamosa Pit No. 2 Permit Action: Inspection 2024 Permit/Job#: M1983175 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 10/8/2024 County: Alamosa Filename: M175-003 <br /> User: JLE <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Cat D9T - 9SU <br /> Machine: <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership $253.16 NA <br /> Cost/Hour: <br /> Operating $164.3 5 100 <br /> Cost/Hour: <br /> Ripper own. $18.79 NA <br /> Cost/Hour: <br /> Ripper op. $1.42 15 <br /> Cost/Hour: <br /> Operator $3 8.59 <br /> Cost/Hour: NA <br /> Total unit $476.31 <br /> Cost/Hour: <br /> Total Fleet $952.61 <br /> Cost/Hour: <br /> MATERIAL QUANTITIES <br /> Initial 142,733 <br /> Volume: <br /> Swell factor: 1.000 <br /> Loose 142,733 LCY <br /> volume: <br /> Page 7 of 17 <br />