Laserfiche WebLink
Import Inert Fill - $10 per CY of inert fill <br /> Task 002 —Import Inert Fill to backfill open groundwater ponds <br /> • Based on June 4, 2023 Google Earth imagery there are two open groundwater ponds. <br /> o Pond 1 — 1.74 acres—Assume 6:1 side slopes <br /> ■ Need 14,150 CY of fill <br /> o Pond 2 —6.47 acres- Assume 6:1 side slopes <br /> ■ Need 46,182.7 CY of fill <br /> • Total Fill - 60,332.7 CY of Fill <br /> o Assume $10/CY to purchase fill material <br /> • Total Cost- $603,327.00 <br /> Page 6 of 17 <br />