My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-11_INSPECTION - C1994082
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1994082
>
2024-10-11_INSPECTION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 8:38:18 AM
Creation date
10/21/2024 3:02:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Date
10/11/2024
Doc Name Note
Partial inspection
Doc Name
Inspection Report
From
DRMS
To
Seneca Property LLC
Report Quarter_Month
Oct
Inspection Date
10/10/2024
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 October 2024 <br /> C-1994-082/Yoast Mine RAR <br />Page 2 of 9 <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted <br /> V=Violation Issued NA=Not Applicable <br />R - Air Resource Protection <br />N - Availability of Records <br />NA - Backfill & Grading <br />NA - Excess Spoil and Dev. Waste <br />NA - Explosives <br />R - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />NA - Other <br />NA - Processing Waste <br />R - Roads <br />R - Reclamation Success <br />R - Revegetation <br />R - Subsidence <br />R - Slides and Other Damage <br />NA - Support Facilities on site <br />N - Signs and Markers <br />NA - Support Facilities Not on site <br />NA - Special Categories Of Mining <br />NA - Topsoil <br /> <br />COMMENTS <br /> <br />This was a partial inspection of the Yoast Mine, C1994082, operated by Seneca Property LLC. The <br />inspection was conducted, and the report prepared by me, Robin Reilley of the DRMS. No hydrologic or <br />air quality issues were detected at the time of inspection. The weather was clear and calm, and <br />temperatures hovering around 70 degrees Fahrenheit. Repairs to the decant structure were taking place at <br />Pond 10. This consist of digging through the dam to remove the culvert that runs from the decant <br />structure to the drainage way to the flume, and replacing with a new decant structure and culvert system. <br /> <br /> <br />MAINTENANCE ITEMS <br />1. Decant structures at ponds 10 and 14 are being repaired. <br /> <br />INSPECTION: <br />GENERAL MINE PLAN COMPLIANCE: <br /> <br />Reclamation has been completed at the site with the exception of the hillside above Pond 12 and ponds <br />12, 13 and 14. These areas comprise approximately 120 acres of Phase I and II reclamation slated for full <br />phase III release this fall. <br /> <br />ROADS Rule 4.03 <br />Construction 4.03.1(3), 4.03.2(3); Drainage 4.03.1(4), 4.03.2(4); Surfacing and Maintenance <br />4.03.1(5) and (6); 4.03.2(5) and; Reclamation 4.03.1(7) I 4.03.2(7). <br /> <br />o Roads appeared stable and in good condition. <br />o No fugitive dust was noted. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.