My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-18_INSPECTION - C1981010
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2024-10-18_INSPECTION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 8:35:22 AM
Creation date
10/21/2024 3:02:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
10/18/2024
Doc Name Note
complete OSM oversight
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining, Inc.
Report Quarter_Month
Oct
Inspection Date
10/8/2024
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-1981-010/Trapper Mine RAR <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 13 <br /> <br />The following illustrates where topsoil depths were measured, and the depth of soil measured at each <br />point. Average topsoil depth was calculated to be 10.2 inches throughout the area. <br /> <br /> Map I: Location and depth of measured topsoil in D and E Pit parcels. <br /> <br />USE of EXPLOSIVES – Rule 4.08 <br />General Requirements 4.08.1; Pre blasting survey 4.08.2; Public Notice of Blasting Schedule 4.08.3; <br />Surface Blasting Requirements 4.08.4; Records of Blasting for Surface Coal Mining 4.08.5; <br />Seismographic Measurements 4.08.6d stripping. <br />o Blasts were being prepared in L and J Pits. Blasting was scheduled for later in the week. <br />o Blasting sign was stationed at the entrance as required. <br />o Blast records were e-mailed to The Division as they were not printed for review at the time of <br />inspection. <br /> <br />SLIDES and OTHER DAMAGE- Rule 4.12 <br />o A crack has existed at top of D Pit. Despite 2023 efforts to mitigate the cracking, the crack <br />remerged in 2024. <br />o The operator routinely monitors the scarp areas for any changes, specifically additional <br />movement, cracking or slumping. <br /> <br />BACKFILL and GRADING – RULE 4.14 <br />o Reclamation consists of benched (dragline), and dozer piled overburden in L Pit awaiting <br />grading, generally an ongoing activity at Trapper Mine. <br />o The flat surfaces of the Ash Pit were dry and firm, with no standing water or ruts. <br /> <br />REVEGETATION - Rule 4.15 <br />General Requirements 4.15.1; Use of Species 4.15.2, Grazing 4.15.5 <br />o Revegetated areas of reclamation appear stable. Most species were dormant at the time of <br />inspection. <br />o Discing and seeding of D Pit with permanent seed mixture is scheduled for later int eh week.
The URL can be used to link to this page
Your browser does not support the video tag.