Laserfiche WebLink
Table E-2 Reclamation Volumes <br /> Material Available on Site Requirements for Reclamation <br /> Disturbance Area Topsoil Overburden Topsoil Overburden Backfill <br /> Area (acres) Stripped Stripped(CY) Required Required(CY) <br /> (CY) (CY) <br /> Mining Area& <br /> Surroundings to 901 727,000 32,715,000 727,000 32,715,000 <br /> Lbe Reclaimed <br /> Excess material will be used for backfilling. Mid-States Materials, LLC will keep at least the <br /> minimum amount of material (topsoil and overburden) required for reclamation of the 5 acres of <br /> disturbance throughout the entire mine life. <br /> 2. Topsoil Replacement <br /> All topsoil will be salvaged for use only in reclamation. The topsoil will be timely replaced as <br /> mining continues. A range of 5-7 inches of topsoil will be stripped and stockpiled prior to mining. <br /> After backfilling and grading has been completed during reclamation, topsoil will be replaced at <br /> the same thickness range, at an average depth of one-half foot in a manner that is similar to the <br /> pre-mine soil profile. Replaced topsoil will be directly placed by loaders and haul trucks. All <br /> topsoiled areas will be disced to aid in root penetration. <br /> 3. Haul Roads and Access <br /> All internal haul roads will remain following reclamation to support the future land use. <br /> Limon Sand& Gravel Pit Lewicki&Associates <br /> August 2024 E 2 <br />