My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-05_REVISION - M2009082 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009082
>
2024-10-05_REVISION - M2009082 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2024 7:28:45 AM
Creation date
10/8/2024 8:48:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
Revision
Doc Date
10/5/2024
Doc Name
Notice of Surety Increase
From
DRMS
To
Julie Mikulas Martin Marietta Materials, Inc.
Type & Sequence
SI2
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#002 Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil <br /> Site: Parsons Mine Permit Action: SI-1 Permit/Job#: M2009082 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 10/2/2024 County: Weld Filename: M082-002 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 50 10 <br /> Ownership cost/hour: $281.32 NA NA NA $129.81 $11.65 <br /> Operating cost/hour: $319.35 NA NA NA $44.57 $2.25 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $57.52 NA NA NA $56.70 $0.00 <br /> Unit Subtotals: $658.19 NA NA NA $231.07 $13.90 <br /> Number of Units: 4 0 0 0 1 1 <br /> Group Subtotals: Work: $2,632.76 Support: $0.00 Maine $244.97 <br /> Total work team cost/hour: $2,877.73 <br /> MATERIAL QUANTITIES <br /> Initial volume: 130,000 CCY Swell factor: 1.000 <br /> Loose volume: 130,000 LCY <br /> Source of estimated volume: Ex L Approved Permit <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 34.00 LCY <br /> 75%Earth <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 30.79 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.