Laserfiche WebLink
(blue earth <br /> SOLUTIONS <br /> August 12, 2024 <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Attn: Mr. Joel Renfro <br /> 1313 Sherman Street; Room 215 <br /> Denver Colorado, 80203 <br /> RE: Response to Adequacy Review Comments for Connell Resources, Inc. <br /> Timnath Connell Pit No. M-1999-050 <br /> Dear Mr. Renfro: <br /> The following discussion and attachments are submitted on behalf of our client, Connell <br /> Resources, Inc., in response to the Adequacy Review comments prepared by the Division of <br /> Reclamation, Mining and Safety (the Division) dated August 1, 2024 for the Timnath Connell Pit <br /> 112 Construction Materials Reclamation Permit amendment application. The information and <br /> discussion below addresses each comment as it was presented by the Division: <br /> 6.4.5 Exhibit E—Reclamation Plan <br /> 1. The mining phase and schedule in the application (see table below) indicates that mining in <br /> Phase 1 and Phase 2 is complete and Phase 3 mining will be complete in 3-5 years. <br /> Mine Phasing Summary <br /> Total Acreage Duration <br /> Mine Phase Mining Status <br /> (acres) (years) <br /> Phase 1 75 Complete - - - <br /> Phase 2 45 Complete - - - <br /> Phase 3 20 In Progress 3-5 <br /> TOTAL 140 3—5 <br /> For the reclamation schedule,Phase 1 reclamation is in progress,Phase 2 reclamation is nearly <br /> complete,and Phase 3 reclamation is concurrent with mining. Phase 1 reclamation will include <br /> additional backfill, compaction, and surface stabilization with concurrent construction of the <br /> reservoir clay liner. These activities should be complete in 5-8 years. Permanent augmentation <br /> of the recharge ponds will complete the Phase 1 reclamation in 8-10 years.Phase 2 reclamation <br /> has included backfilling, compaction, and stabilization with vegetation growth. Partial release <br /> for the Phase 2 area will likely be requested within a year. Phase 3 reclamation is concurrent <br /> with Phase 3 mining and will include backfilling, compaction, and surface stabilization and <br /> should be complete in 4-6 years. <br /> Blue Earth Solutions, LLC • P.O. Box 2427 • Fort Collins,CO 80522 • (970)227-2803 <br />