My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-13_REVISION - M1997026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997026
>
2024-08-13_REVISION - M1997026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 7:59:34 AM
Creation date
8/14/2024 7:45:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997026
IBM Index Class Name
Revision
Doc Date
8/13/2024
Doc Name
Request for Technical Revision
From
Carol Ann Pit LLC
To
DRMS
Type & Sequence
TR4
Email Name
LDS
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:FF198071-0762-464A-8202-7F56EEDAE 4 H 1 BIT A <br /> 7. Water Consumption for the Operation <br /> Water consumption for Newby Aggregate Recycling will fall into three main categories as <br /> detailed below.Water supply for the operation will be by the water right on the CM Stremme <br /> Gates ditch.Additional water may be secured,and proof of that additional water supply will be <br /> provided to Eagle County as needed. <br /> 7 1 Control Dust on the Haul Roads and Excavation Areas <br /> Water application for dust control will take place at least four times a day over all active or <br /> unfixed disturbed areas. Unfixed disturbed areas are areas such as the pile being actively <br /> recycled where the nature of activity prevents the use of magnesium chloride.Active stockpiles <br /> require additional watering to ensure material stays wet. Magnesium chloride will be used to <br /> control dust on disturbed areas such as fixed haul paths and inactive disturbed areas(ground <br /> beneath plants or stockpiles). <br /> It is also assumed that additional watering will be needed during very dry windy conditions <br /> during operations.The Facility Manager will determine when and where this is needed during <br /> operations. <br /> 7.2 Crushing and Screening Plant Operations <br /> The crushing/screening plant uses water to control dust with water sprays and on the screen deck. <br /> It will also have sprays at the entrance. <br /> 7.3 Wash Plant Operations <br /> The wash plant will be used to remove fines from material to create washed rock for sale. <br /> Wash plant water recycling will produce fines in the bottom of the wash ponds adjacent to the <br /> plant.These ponds will be inspected monthly for capacity.Fines will need to be removed <br /> periodically from the wash ponds.The frequency of this clean out will depend on production <br /> rates and how"dirty"the recycled material is at any time.Fines removed from the wash ponds <br /> via cleanout will be sold as product.These fines will never be placed outside of stormwater <br /> controls. <br /> Newby Agg Recycling 14 I a,.uYi and Asweirl s.PI IA <br /> April 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.