My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-13_REVISION - M1997026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997026
>
2024-08-13_REVISION - M1997026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 7:59:34 AM
Creation date
8/14/2024 7:45:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997026
IBM Index Class Name
Revision
Doc Date
8/13/2024
Doc Name
Request for Technical Revision
From
Carol Ann Pit LLC
To
DRMS
Type & Sequence
TR4
Email Name
LDS
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID.FF198071-0762 464A-8202-7F56EEDAED42 <br /> ExHIBIT A <br /> The bulk of the site will not be visible to the south as the Production Area and Storage Area <br /> floors are roughly 40 feet below the ground level to the south.This can be seen on the cross <br /> sections on Map 4. Landscaping will be built along the south side of the operation to provide <br /> further visual mitigation.This will include landscaping as shown in detail on the Landscape Plan <br /> in Appendix 5 of the Special Use Permit.The goal of landscaping is to minimize the visibility of <br /> the operation on the whole. Some specific facilities,such as a portable hot mix asphalt plant,will <br /> be visible when onsite,as the tallest portion(-70 feet tall)of such a plant is too tall to obscure. <br /> Vegetation along the Eagle River prevents visibility of the property from 1-70. <br /> 5. Traffic Control <br /> Traffic will travel via the existing property access to US-6.This access was built to <br /> accommodate the traffic of a busy gravel pit,and therefore will be more than sufficient for the <br /> proposed facility. <br /> Additional operational practices to control traffic will include: <br /> • Maintenance of signage and speed limits for truck traffic entering and leaving the <br /> frontage road <br /> • Maintenance of a designated parking area away from stockpiles and internal traffic <br /> • Usage of a designated maintenance area for all minor equipment maintenance such as <br /> greasing and refueling in the facilities area <br /> • Tracking pads will be used at all entrances to the site to ensure sediment and mud control <br /> 6. Stormwater Control Plan <br /> See the attached Plan. <br /> Newby Agg Recycling 13 X ,;m I1.1%Obi a,.d ASSOCAM, .I.< <br /> • April2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.