Laserfiche WebLink
DocuSign Envelope ID:FF198071-0762464A-8202-7F56EEDAE 42 H I B I T A <br /> • Internal speed limit of 10 mph <br /> In the event that equipment or activity generates nuisance noise in a manner that was <br /> unanticipated, such activity or equipment will be taken offline until it can be operated in a non- <br /> nuisance manner.The Facility Manager can be contacted by anyone in the area or at Eagle <br /> County that detects a nuisance noise. <br /> Contractor equipment will be required to operate under the same constraints as that of the <br /> operator. <br /> 3. Dust Control <br /> Fugitive dust is regulated by the CDPHE Air Pollution Control Division.Prior to operations,a <br /> ' fugitive dust permit shall be obtained from CDPHE.This permit will include limits on <br /> processing,disturbed area, haul distances,and other factors that all combine to affect fugitive <br /> dust generation.The operation of the facility below original grade and behind landscaping will <br /> , limit the dust that can physically leave the site.In addition to the site plan(Map 2),the following <br /> best management practices will be in place for the operation: <br /> • Recycling operations will only take place when dust control water is available <br /> • Processing will be limited to the Processing Area <br /> • Crushing and screening of material will be wet <br /> • All disturbed ground will either be coated in magnesium chloride or watered four times a <br /> day <br /> • Haul roads and area floor will be graveled once they have been constructed <br /> • Product stockpiles will be maintained moist either from processing or from truck <br /> watering <br /> • Internal haul routes in place for>90 days will be treated with magnesium chloride <br /> • Product stockpiles will be treated an additional time with water and/or a binding agent <br /> such as magnesium chloride at the end of business each Saturday <br /> • Product stockpiles will be"depeaked"to minimize the profile exposed to wind <br /> • <br /> • All areas outside of operational uses will be revegetated <br /> Newby Agg Recycling 11 �J( (,m I�kid and`ss�atn.PI IA <br /> April 2020 ./1� <br />