My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-13_REVISION - M1997026
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997026
>
2024-08-13_REVISION - M1997026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2024 7:59:34 AM
Creation date
8/14/2024 7:45:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997026
IBM Index Class Name
Revision
Doc Date
8/13/2024
Doc Name
Request for Technical Revision
From
Carol Ann Pit LLC
To
DRMS
Type & Sequence
TR4
Email Name
LDS
AME
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:FF198071-0762-464A-8202-7F56EEDAE42 H I B I T A <br /> IMPACT MANAGEMENT PLAN <br /> 1. General Impact Mitigation <br /> All impacts generated at Newby Aggregate Recycling will be confined to the Production Area <br /> and Storage Area.Both areas are roughly 40 feet below the grade of land to the south, including <br /> the railroad and highway US-6.This topographic difference will significantly screen the <br /> operation activities from neighbors to the south where most of the neighboring population is. <br /> Additionally, landscaping along the perimeter of the site will be designed and built to provide <br /> maximum practical screening of the operation. • <br /> Specific impacts and the operational controls and best management practices(BMPs)that will be <br /> used to address them are discussed in detail below. <br /> 2. Noise Control <br /> A variety of best management practices will be employed to mitigate noise impacts.They <br /> include: <br /> • Non-beeping back up alarms(ambient-controlled broadband) <br /> o Backing up by contractor vehicles not out fitted with these alarms will be <br /> minimized <br /> • Containing all activity to the floors of the Production Area and Storage Area as much as <br /> possible <br /> • Operation of processing plants limited to the hours of operation <br /> • Haul trucks will not use J-brakes <br /> • Processing in a fixed location behind screening landscaping <br /> • Using an existing access point to US-6 <br /> • Periodic decibel measurements at the property line to ensure compliance with state and <br /> local limits <br /> • Aggregate stockpiles or similar noise barrier should be maintained with heights of 20 feet <br /> tall(or at least 3 feet taller than the noise source they are blocking)and near the noise <br /> source. <br /> Newby Agg Recycling 10 X tarty.) Aunciakt PI IA <br /> April 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.