My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-08-07_PERMIT FILE - M2024043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024043
>
2024-08-07_PERMIT FILE - M2024043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 9:05:10 AM
Creation date
8/8/2024 8:57:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024043
IBM Index Class Name
Permit File
Doc Date
8/7/2024
Doc Name
Application
From
Harry Corkle Construction
To
DRMS
Email Name
BFB
ZTT
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RPM,Inc.,25049 E.Alder Dr.,Aurora,Co 80016 Phone:(303)854-7499 Email:hlhumphries2racomcast.net <br /> farthest point. It should not be impacted significantly by the mining operation since <br /> appropriate Best Management Practices will be part of the proposed mining operation. In <br /> addition, all extraction activities will occur on the top of the plateau and not on the side <br /> slopes, toward Arapaho Creek. <br /> (d) The size of the area(s) to be worked at any one time: <br /> Total acres to be stripped in a given year will be 5 - 6 acres, dependent upon market <br /> demand. <br /> (e) An approximate timetable to describe the mining operation: <br /> This is an ongoing, intermittent, mining operation. The expected life of the mining area <br /> is 22-35 years, depending on market demand. We estimate the number of mineable <br /> acres, by phase, is as follows: <br /> Table 1: Phase, Approximate Mineable Acres and Timetable* <br /> Phase Approx. Approx.Mineable <br /> Production Period Acres <br /> -Years <br /> (Assume 5 A/Yr.) <br /> A-1 4.9 24.42 <br /> B-1 2.8 13.93 <br /> A-2 6.5 32.48 <br /> B-2 1.7 8.34 <br /> A-3 4.4 21.79 <br /> B-3 2.3 11.49 <br /> TOTAL 22.6 112.45 <br /> (Please Note: As mining in a Phase is completed and the next Phase begins, reclamation of <br /> the previous Phase will begin.) <br /> (i) An estimate of the periods of time which will be required for the various <br /> phases: <br /> Please see the above Table 1. <br /> (ii) A description of the size and location of each area to be worked during each <br /> phase: <br /> Please see Map C-2, and the above Table 1. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.