My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-27_BONDING - C1981018
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981018
>
2024-06-27_BONDING - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 9:41:47 AM
Creation date
7/10/2024 9:39:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Bonding
Doc Date
6/27/2024
Doc Name Note
Findings & Reclamation Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#002 Page 2 of 2 <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.838 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.5634 <br /> Adjusted unit production: 307.62 LCY/hr <br /> Adjusted fleet production: 1230.48 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 4 Dozer(s) <br /> Unit cost: $1.498/LCY <br /> Total job time: 145.14 Hours <br /> Total job cost: $267,450 <br />
The URL can be used to link to this page
Your browser does not support the video tag.