My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-27_BONDING - C1981018
DRMS
>
Day Forward
>
Bonding
>
Coal
>
C1981018
>
2024-06-27_BONDING - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 9:41:47 AM
Creation date
7/10/2024 9:39:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Bonding
Doc Date
6/27/2024
Doc Name Note
Findings & Reclamation Cost Estimate
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN8
Email Name
CCW
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#003 Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Regrade Water Storage Areas and Access Road <br /> Site: Deserado Mine Permit Action: RN-8 Permit/Job#: C1981018 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 6/26/2024 County: Rio Blanco Filename: C018-003 <br /> User: TJ1 <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $238.76 NA <br /> Operating Cost/Hour: $162.29 100 <br /> Ripper own.Cost/Hour: $18.32 NA <br /> Ripper op.Cost/Hour: $8.98 1 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $469.65 <br /> Total Fleet Cost/Hour: $1,878.61 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 4,750 <br /> Swell factor: 1.111 <br /> Loose volume: 5,277 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Permit Volume IV <br /> Operator Study <br /> HOURLY PRODUCTION <br /> Average push distance: 150 feet <br /> Unadjusted hourly production: 910.5 LCY/hr <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push gradient: 5 % <br /> Average site altitude: 5,300 feet <br /> Material weight: 2,743 lbs/LCY <br /> Weight description: User Provided <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.900 AB.AVG. <br /> Material consistency: 1.000 CAT HB <br /> Dozing method: 1.000 GEN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.