Laserfiche WebLink
RECLAMATION PLAN EXHIBIT E(CONT) <br /> The placement of the soil stockpiles around the perimeter <br /> of the mined area or direct replacement on the final slopes as <br /> stripping takes place helps reduce the cost to reclaim the site <br /> if mining ended midway thru the site. It also means that the <br /> topsoil only has to be handled once and reclamation can run <br /> concurrent with mining. <br /> There are sufficient amounts of growth medium on the site <br /> so the mined area can be resoiled to a maximum average depth of <br /> four (4) inches . Additional growth medium (overburden and <br /> processing fines) will be salvaged during processing to <br /> supplement the topsoil if needed. All topsoil encountered will <br /> be saved from the stripping process and the operator will not <br /> haul additional soils onto the site for revegetation. Existing <br /> soils in place have been capable of producing a sparse cover of <br /> grasses suitable for grazing purposes when not abused. The <br /> vegetation information was obtained from site visits and data <br /> provided in the vegetation information obtained from the NRCS <br /> soil survey web page. A copy of that report is in EXHIBIT'S I AND J <br /> and describes the current cover in the terms of yearly <br /> production and will serve as background information as <br /> reclamation progresses . Our site specific investigations <br /> suggest the range quality is on the average to poor side due to <br /> management practices . <br /> As outlined in the MINING PLAN, up to 40 . 01 acres ± of the <br /> permitted area will be disturbed as a result of mining. Since <br /> there are no stages in the permit, reclamation will run <br /> concurrent with mining. The plan calls for having no more than <br /> 20 . 0 acres ± disturbed at any-one-time. As mining progresses <br /> across the property some parts of the property will remain <br /> undisturbed while other areas will be either stripped, mined, <br /> partially reclaimed or totally reclaimed. The MINING PLAN MAP- <br /> ExHIBITC-1 shows how the pit will look when approximately 63% is <br /> stripped, mined and partially reclaimed. The RECLAMATION PLAN MAP- <br /> EXHIBITF shows how the area will look when reclamation is <br /> complete. The area will be returned to at least it ' s present <br /> vegetative condition when reclamation is complete. <br /> Careful analysis of the growth medium and salvaged soil <br /> will permit the operator to carry out a soil additive program <br /> and to monitor the prescribed seeding plan and to determine if <br /> the plan requires revision. Under normal weather conditions, <br /> an adequate moisture reserve will be present for establishment <br /> Big Bull Dog Trucking, Inc. Soward Ranch Pit <br /> Permit M-1988-021 14 June 21, 2024 <br />