Aspect j Reclamation Operation Quantity Units Unit Cost($) Cost($)
<br /> Active Mining Area
<br /> Al Doze active mine face to 3H:1V slopes 6,250 CY $0.50 $3,125
<br /> [500'x 0.5(15'x 45')] -
<br /> A2 Backfill two un-reclaimed pit side slopes 12,500 CY $1.05 $13,125
<br /> to 3H:1V [(2 x 500)x 0.5(15'x 45')] _
<br /> Rough grade pre-stripped area,dozed active mine
<br /> A A3 face,backfilled side slopes,and active mining pit 7,099 CY $0.50 $3,549
<br /> floor to drain(8.8 acres x 0.5')
<br /> A4 Place growth medium on all Aspect A areas 14,197 CY $1.05 $14,907
<br /> (8.8 acres x 1.0') _
<br /> A5 Final grade all Aspect A areas 7,099 CY $0.50 $3,549
<br /> (8.8 acres x 0.5)
<br /> Material Processing Area(Asphalt,Recycling)
<br /> B1 Scarify pit floor(8 acres). 8 Ac $500.00 $4,000
<br /> B2 Rough grade pit floor to drain(8 acres x 0.5) 6,453 CY $0.50 $3,227
<br /> Place growth meduim on scarified pit
<br /> B B3 floor(8 acres)and side slopes previously 15,649 CY $1.05 $16,432
<br /> backfilled/rough graded to 3H:1 V(1.7 acres)
<br /> (9.7 acres x 1.0')
<br /> B4 Final grade all Aspect B areas 7,825 CY $0.50 $3,912
<br /> (9.7 acres x 0.5')
<br /> Partially Reclaimed Mining Area
<br /> Place growth meduim on 1,000 linear feet of
<br /> Cl previously backfilled and rough graded side 11,455 CY $1.05 $12,027
<br /> C slopes and pit floor rough graded to drain
<br /> (7.1 acres x 1.0')
<br /> -
<br /> C2 Final grade all Aspect C areas 5,727 CY $0.50 $2,864
<br /> (7.1 acres x 0.5')
<br /> Miscellaneous Disturbed Areas
<br /> Scarify scale house/office,maintenance,employee
<br /> D1 parking,and other areas disturbed by mining 2 Ac $500.00 $1,000
<br /> activities
<br /> (2 acres)
<br /> D D2 Rough grade all Aspcet D areas 1,613 CY $0.50 $807
<br /> (2 acres x 0.5') _
<br /> D3 Place growth medium on all Aspect D areas 1,613 CY $1.05 $1,694
<br /> (2 acres x 0.5)
<br /> D4 Final grade all Aspect C areas 1,613 CY $0.50 $807
<br /> (2 acres x 0.5')
<br /> IFinal Reclamation
<br /> El Seed all areas in Aspects A,B,C,and D 27.6 Ac $675 $18,630
<br /> E (8.8+9.7+7.1+2)acres
<br /> •
<br /> •
<br /> E2 Re-seed 20%of areas in Aspects A,B,C,and D 5.5 Ac $675 $3,726
<br /> 'Total Reclamation Costs $107,381
<br /> Contractor Mobilization/Demobilization Costs(8%) 0.08 $8,590
<br /> Overhead(18.5%) 0.185 $19,865
<br /> Administration(5%) 0.05 $5,369
<br /> ''Total Proposed Financial Warrenty $141,206
<br /> Disturbed Acreage 27.6
<br /> Financial Warrenty per Acre $5,116
<br /> 5.1 Pit
<br /> DRMS 112 Permit Application Page 26
<br />
|