Laserfiche WebLink
Other miscellaneous disturbed areas at the point of maximum disturbance will include internal <br /> haul roads, and other areas disturbed by mining activities. These areas will be tilled in <br /> preparation for topsoil/overburden growth medium placement, final grading, and seeding for <br /> revegetation. It is estimated that the combined area of these disturbances will be approximately <br /> two (2) acres. <br /> Since quality topsoil is not abundant on the 5J Pit site, vegetation growth medium will include <br /> the best quality topsoil/overburden material available. If available, a minimum of 6 inches of <br /> growth medium will be placed on all disturbed areas following backfilling, scarifying, and/or <br /> rough grading. Final grading of the topsoil/overburden growth medium will prepare the surface <br /> for seeding. After initial seeding and the first season's growth, it is estimated that approximately <br /> 20 percent of the seeded area will need to be re-seeded. <br /> 5J Pit <br /> DRMS 112 Permit Application Page 25 <br />