My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-18_HYDROLOGY - M2019028
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2019028
>
2024-06-18_HYDROLOGY - M2019028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2024 8:37:18 AM
Creation date
6/21/2024 8:29:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
Hydrology
Doc Date
6/18/2024
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim South Platte Combined SWSP June 18, 2024 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, i± 6243 Page 21 of 26 <br /> water commissioner(s). If approved prior, the release of replacement water may be <br /> aggregated to maximize beneficial use. The water commissioner(s) and/or the division <br /> engineer shall determine the rate and timing of an aggregated release. <br /> 7. The Applicant must replace all out-of-priority depletions and return flow obligations resulting <br /> from operation under this SWSP, including those lagged depletions and return flow obligations <br /> that occur to the stream after the expiration date of this SWSP. <br /> 8. Conveyance loss for delivery of replacement water is subject to assessment and modification <br /> as determined by the division engineer. The distance for assessment of conveyance loss will <br /> be based upon DWR stream miles or as approved by the Water Commissioner, and will be <br /> assessed from the point of release to the point of depletion/replacement. <br /> 9. The replacement water which is the subject of this plan cannot be sold or leased to any other <br /> entity unless prior approval is obtained from the state or division engineer. As a condition of <br /> subsequent renewals of this substitute water supply plan, the replacement water must be <br /> appurtenant to these sites until a plan or plans for augmentation are obtained. All <br /> replacement water must be concurrent with depletions in quantity, timing, and locations. <br /> According to affidavits dated February 29, 2012 and April 23, 2019, the Applicant dedicated <br /> the 13.5 shares of the Whitney Ditch Company, 96 shares of the Fulton Irrigating Ditch <br /> Company, and 5/121h, interest in the Zweck i± Turner Ditch as replacement water solely for <br /> this SWSP for as long as there are depletions at these gravel pit sites or until such time as <br /> another replacement source is obtained. For the purposes of this SWSP, these affidavits will <br /> be accepted for the dedication of the shares; however, if the state engineer determines that <br /> a different affidavit or dedication process is necessary to assure proper dedication of the <br /> shares, additional information may be required prior to future SWSP approvals. <br /> 10. All diversions shall be measured in a manner acceptable to the division engineer. The <br /> Applicant shall install and have approved by the Water Commissioner all structures prior to <br /> any credit or use in this SWSP. The Applicant shall maintain such measuring devices as <br /> required by the division engineer for operation of this SWSP. <br /> 11. The Division of Water Resources will not acknowledge any recharge activity conducted <br /> without the knowledge of the water commissioner. The flow into the recharge site must be <br /> metered and equipped with a continuous flow recorder unless the water commissioner, in <br /> conjunction with the division engineer, determines adequate records may be kept without <br /> such equipment. <br /> 12. The Applicant shall follow the attached Division 1 Recharge Protocol for the operation of this <br /> SWSP, except that for the reasons described in this SWSP, evaporative losses from the <br /> Lighthouse Cove Pond do not need to be considered. <br /> 13. The Applicant shall provide daily accounting (including, but not limited to diversions, <br /> depletions, replacement sources, and river calls) on a monthly basis. The accounting must be <br /> uploaded to the CDSS Online Reporting Tool within 30 days of the end of the month for which <br /> the accounting applies (https://dwr.state.co.us/Tools/reporting). In addition, the accounting <br /> must be submitted to the water commissioners [currently Jorge Vidal <br /> (Jorge.Vida[@state.co.us), Mark Simpson (Mark.Simpson@state.co.us), Shera Sumerford <br /> (Shera.Sumerford@state.co.us), and Michael Hein (Michael.Hein@state.co.us)] within 30 <br /> calendar days of the end of the month for which the accounting is being made. Instructions <br /> for using the tool are available on the Division of Water Resources website on the "Services" <br /> "Data i± Information" page under the heading of "Online Data Submittal. Accounting and <br /> reporting procedures are subject to approval and modification by the division engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.