My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-18_HYDROLOGY - M2019028
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2019028
>
2024-06-18_HYDROLOGY - M2019028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2024 8:37:18 AM
Creation date
6/21/2024 8:29:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
Hydrology
Doc Date
6/18/2024
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Holcim South Platte Combined SWSP June 18, 2024 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, F± 6243 Page 20 of 26 <br /> areas. Once backfilling is complete, additional <br /> SWSPs will be required until the applicant has <br /> replaced all of the remaining tagged depletions. <br /> Tucson South Pit Lined Reservoir $834,000 3 The financial warranty was reviewed as part of an <br /> inspection and the bond was decreased. <br /> Wattenberg Pit Lined Reservoir $520,000 3 Bonded for lining. Pit lined in 2013 and received SEO <br /> liner approval <br /> Platte Valley Pit Groundwater Lake $8,900,000 1, 4 Bonded for backfilling. Water rights dedicated via <br /> February 29, 2012 affidavit. <br /> DPG Pit Groundwater Lake $5 426 609 3 Bonded for lining. <br /> Bonded for backfilling. Lagged and future depletions <br /> from evaporation and consumptive use by wetlands <br /> Distel Pit Groundwater Lake $1,216,716 1, 2 vegetation at the site covered under City of <br /> Longmont augmentation plan decreed in case no. <br /> 2009CW271. <br /> Tull Pit Lined Reservoir $2,947,600 3 Bonded for lining. Conditional water storage right <br /> decreed in case no. 1994CW062. <br /> Irwin-Thomas Pit Lined Reservoir $8,176,204 3 Bonded for lining. <br /> Conditional water storage right and plan for <br /> W.W. Farms Pit Lined Reservoir/ $11 300 000 2 augmentation for evaporation from up to 66 acres of <br /> Groundwater Lakes water surface area decreed in case no. 1990CW23 <br /> site urrently exposes 64 acres). <br /> F-Street Pit Groundwater Lake $10,920,753 1 or 3 Bond amount increased to cover the cost of <br /> backfilling the site. <br /> Conditions of Approval <br /> I hereby approve this substitute water supply plan, in accordance with section 37-90-137(11), <br /> C.R.S., subject to the following conditions: <br /> 1. This SWSP shall be valid for the period of January 1, 2024 through December 31, 2024 unless <br /> otherwise revoked or superseded by decree. Should a request for renewal of this plan be <br /> needed, such renewal request must be submitted to this office with the statutory fee <br /> (currently $257 per pit) no later than November 1, 2024. If a renewal request is received <br /> after the expiration date of this plan, it may be considered a request for a new SWSP in <br /> which case the filing fee for a new SWSP will apply (currently $1,593 per pit). <br /> 2. Well permits have been obtained for the current use and exposed groundwater surface area of <br /> each gravel pit in accordance with sections 37-90-137(2) and (11), C.R.S., as identified in <br /> Table A of this approval. <br /> 3. The total area of groundwater surface exposed after December 31, 1980 for each of the pits <br /> shall not exceed those values listed in Table A of this approval. Should the total surface area <br /> exposed exceed those amounts, an amendment will need to be filed with this office. <br /> 4. The total amount of groundwater to be consumed at each of the pits shall not exceed the <br /> values listed in Table C of this approval. Total consumption at each pit must not exceed these <br /> amounts unless an amendment is made to this plan. <br /> 5. Approval of this plan is for the purposes as stated herein. This office must first approve any <br /> additional uses for the water. Any future additional historical consumptive use credit given <br /> (e.g., agricultural water transfer) for these sites must consider all previous credits given. <br /> 6. All releases of replacement water must be sufficient to cover all out-of-priority depletions in <br /> time, place, and amount and must be made under the direction and/or the approval of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.