Laserfiche WebLink
Table A-10.7 Calculations for time required for topsoiling - J Pit East (with Scrapers) <br />Jennings Pit East <br />Haul Average Production Adjusted* Fleet <br />Route Cubic Distance Grade Rate Production Scraper/Truck Number of Fleet Cost Total <br />From Yards (Ft.) (%) (cyds/hr) (cyds/hr) Hours Scrapers Hours ($/hr) ($) <br />400 6.25 <br />JPE-1 to J Pit East 74,052 764 -3.9%337.38 337 219 8 27.44 5,615.15$ 154,059.62$ <br />1053 -6.7% <br />74,052 2,217 -1.49 337.38 337 219 8 27.44 5,615.15$ 154,059.62$ <br />45.9 Acres <br />Table A-10.7 Calculations for time required for topsoiling - Lancaster pit-K Knob (with Scrapers) <br />Lancaster Pit <br />Haul Average Production Adjusted* Fleet <br />Route Cubic Distance Grade Rate Production Scraper/Truck Number of Fleet Cost Total <br />From Yards (Ft.) (%) (cyds/hr) (cyds/hr) Hours Scrapers Hours ($/hr) ($) <br />L23-1 to L Pit Area 1(K Knob)7,920 732 -3.4% 752 752 11 8 1 5,615.15$ 7,720.83$ <br />7,920 732 -3.4%752 752 11 8 1 5,615.15$ 7,721 <br />4.9 Acres <br />Total Jpit East + K Knob 81,972 161,780.46$