Laserfiche WebLink
1.2.4 Seeded Acres <br /> Trapper seeded 66.4 acres to the permanent vegetation mixture in 2023 to final contour(AOC). <br /> The majority of the D pit topsoiled area was not seeded to the permanent seed mix in 2023. <br /> The area will be aerial seeded with an annual grass mix in the spring of 2024 to first stabilize <br /> the area and help to rejuvenate the topsoil. The topsoil used on this parcel has been stored <br /> since the late 1970's and is likely to be lacking a significant micro-organic biome. The <br /> permanent seed mixture will be placed in the fall of 2024, with the permanent aerial mix added <br /> in the spring of 2025. <br /> 1.2.5 Cultural Practices <br /> In 2023 Trapper also conducted several other cultural practices. These practices are <br /> addressed below. <br /> Drainage Reconstruction <br /> Refer to Section 3.0 of this annual report. <br /> Contour Ditch Construction <br /> During 2023, Trapper did not construct any contour ditches. <br /> Stock Tank Construction <br /> No new Stock Tanks were constructed during the 2023 field season. Refer to Section 6. <br /> Stock Tank Reclamation <br /> No Stock Tanks were reclaimed during the 2023 field season. Refer to Section 6. <br /> Developmental Drill Sites <br /> During the 2023 Developmental Drilling season 7 holes were drilled within the permit boundary. <br /> Drill holes were completed in the I Pit area. All applicable developmental drill holes were <br /> abandoned per permit section 3.3.2 and will be reclaimed and seeded per section 3.6.3.5 of the <br /> permit. Drill hole abandonment typically uses Alternative 2 for sealing of the borehole. <br /> Topsoil Piles <br /> During 2023 piles D97-1 and E78-2 were nearly depleted for topsoil Iaydown in D Pit. Piles D1- <br /> 07, E78-1, E79-4, E79-22A and E87-12 were entirely depleted for topsoil Iaydown in the D Pit <br /> area. Pile 1-20-1 was depleted for Iaydown in the eastern I-Pit area. Piles CG1, MH2 and L21-3 <br /> had additional topsoil added to them from stripping operations. Trapper also constructed seven <br /> new topsoil piles. Topsoil piles C23-1, C23-2, C23-3 and C23-4 in the C Pit area; piles D23-1 <br /> and D23-2 in the D Pit area and L23-1 in the L Pit area. Piles J22-1, J22-2, J22-3A and J22-3B <br /> were moved for pit advancement to pile CG-1. Two small piles were also constructed adjacent <br /> to the newly constructed East and West Buzzard ponds in the NW corner of the permit area. <br /> Refer to Section 5. <br /> Sediment Dams <br /> Sediment ponds Middle Pyeatt#1 and East Pyeatt#1 were cleaned of all sediment and <br /> Johnson #10 was partially cleaned and aquatic vegetation removed in 2023. New Sediment <br /> ponds East Buzzard #3 and West Buzzard #4 were constructed in the northwest corner of the <br /> permit area during the summer of 2023. <br />