My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-15_PERMIT FILE - C1981010 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2024-05-15_PERMIT FILE - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2024 8:30:34 PM
Creation date
6/20/2024 12:08:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
5/15/2024
Doc Name
2023 Annual Reclamation Report Section 1.0
Type & Sequence
TR136
Section_Exhibit Name
Appendix W 2023 Annual Reclamation Report Section 1.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1.0 2023 Annual Reclamation Report <br /> As specified by the revisions (1/3/90) to 2CCR 407-2, 2.04.13, Trapper Mine is submitting an Annual <br /> Reclamation Report for the previous calendar year(2023). <br /> Historically, section 3.5.3 of Trapper's mining and reclamation permit required a reclamation map be <br /> submitted to the CDRMS annually by March 15. Subsequent to 1988 the map entitled the "Postmine <br /> Contour Map"was changed to "Reclamation Map." The reclamation maps developed from aerial <br /> photographs taken during the previous fall shows pit advancements, recontoured spoil areas and a <br /> historical account of the previously regraded areas for the year. <br /> The 2023 reclamation map is a composite of the aerial photographs taken by drone during 2023, and <br /> shows the reclamation performed during 2023 for all areas under bond. Map(s) 1 show the aerial extent <br /> and location of disturbed acres, graded acres, topsoiled acres and perennial seeded acres during 2023. <br /> It also shows the location, aerial extent and reclamation year of all previously revegetated areas, as well <br /> as the actual and projected mature shrub clump establishment areas, topsoil stripping areas and Iaydown <br /> areas for 2023. <br /> 1.1 Permittee Identification <br /> The Permittee for this annual reclamation report is: <br /> Trapper Mining Inc. <br /> P.O. Box 187 <br /> Craig CO 81626 <br /> Permit No. C-1981-010 <br /> 1.2 Results <br /> Table 1.1 and Map(s) 1 show the 2023 reclamation results. The various reclamation stages are <br /> addressed below in separate subsections. <br /> 1.2.1 Disturbed Acres <br /> In 2023, Trapper disturbed 328.9 acres in the C Pit, D Pit, I Pit, J Pit and L Pit areas. <br /> Disturbance consisted of some re-disturbance of Phase III Bond released lands in the former D <br /> Pit area for topsoil pile retrieval and reclamation tie in. Re-disturbance also occurred in the I Pit <br /> and J Pit areas of the former A Pit reclamation for pit advancement. Extensive re-disturbance <br /> occurred in the former B and C Pit reclamation areas for development of the C Pit HWM pit. <br /> Unfortunately this pit will not be further developed at this time and the topsoil stripping that <br /> occurred will have to be reclaimed in the future. Re-disturbance also occurred in the former H <br /> Pit area to re-establish a dragline walkroad back the western panel of the mine. The remaining <br /> disturbance was in L Pit for pit advancement. Table 1.2 documents acres re-disturbed and the <br /> bond release status of each. <br /> 1.2.2 Backfilled and Graded Acres <br /> Trapper completed backfill and grading on 329.6 acres in 2023 to final contour(AOC). The <br /> majority of the D Pit area was completed. Only the haulroad for that pit remains to be regraded. <br /> The eastern portion of the I Pit was also regraded, as was a portion of the dragline walkroad <br /> reestablished in the H Pit area. <br /> 1.2.3 Topsoiled Acres <br /> Trapper re-topsoiled 239.3 acres in 2023 to final contour(AOC). Topsoil was placed in the D <br /> Pit, I Pit and walkroad areas. A small portion of the regraded area in the D Pit reclamation <br /> parcel was not topsoiled in 2023; it will be completed in 2024, as will the remainder of the <br /> dragline walkroad. <br />
The URL can be used to link to this page
Your browser does not support the video tag.