My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-06-07_PERMIT FILE - M2024026 (23)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2024026
>
2024-06-07_PERMIT FILE - M2024026 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2024 7:22:14 AM
Creation date
6/10/2024 10:43:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2024026
IBM Index Class Name
Permit File
Doc Date
6/7/2024
Doc Name Note
Exhibit D - Mining Plan
Doc Name
Application
From
Colorado Sand Company II, LLC
To
DRMS
Email Name
NCG
JLE
EL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br /> Page 24 <br /> ROM material will be trammed(via front-end loader)from the ROM stockpile to the integral feed hopper. <br /> Material will then be conveyed to wet scalping screens where material larger than(oversize)will be <br /> removed and conveyed to an oversize stockpile. Material smaller than(i.e.,passing the 'h"screen)will be <br /> placed into a slurry and pumped across additional screens.Material larger than 30 mesh(#30)will be <br /> removed by secondary screens and dewatered(to approximately 15%moisture content)and conveyed to <br /> the PDS.Material smaller than#30 will be further pumped through attrition cells and cyclones to produce <br /> a#30/140). This product will be dewatered and conveyed to the washed sand stockpile within the Wet <br /> Sand Storage Building. <br /> • Washed Sand Stockpile and Decant System <br /> Washed(interim)product from the wet plant will be delivered to Wet Sand Storage Building(an <br /> approximately 610 ft x 130 ft enclosed structure)via conveyors, and stockpiled inside the structure via <br /> overhead tripper conveyors. The Wet Sand Storage Building will have an anticipated maximum stockpile <br /> height of approximately 48-ft.,occupying a footprint area of approximately 568 ft x 120 ft., sufficient to <br /> accommodate an estimated 70,000 cubic yards of(interim)product for a limited-duration time period, <br /> during which residual moisture will be decanted from the material. The decant system will employ a <br /> perforated pipe underdrain system designed to drain to a common sump, from which recovered water will <br /> be pumped to the Wet Plant clarifier unit for clarification and subsequent re-use. <br /> • Drying and Screening Plant <br /> The drying and screening plant facilities will occupy an approximately 280 ft by 350 ft area within the <br /> central portion of the Plant Area. It will consist of an assemblage of permanently installed equipment,to <br /> include a rotary drying unit and various screening decks,all of which will be placed atop a concrete <br /> foundation. <br /> As depicted in Exhibit D-4: Process Flow Diagram,the post drain-down intermediate product will be <br /> routed to a drying plant,where it will be passed through gas-fired rotary dryer unit(s), after which all <br /> material will report to a 1/16"scalping screen to remove any foreign material from the product that may <br /> have been introduced during the transfer and/or drying processes. The reject will be collected(minor <br /> quantities)under individual scalping screens, until moved to either the PDS or a pit void area for <br /> disposition. Each gas fired rotary dryer will be equipped with a cyclone and bag house to remove fines <br /> material(particulate)from the air flow stream;this fines"reject"will be conveyed to a small"reject" <br /> stockpile,where it will remain until space constraints dictate removal to the process discard stockpile <br /> (PDS).The desired#30/140 end(saleable)product emanating from the gas-fired rotary dryer and scalping <br /> screen circuit will be conveyed to the Dry Sand Storage Building where tripper conveyors will again be <br /> utilized to stockpile the product. <br /> • Oversize(Reject)Stockpile <br /> The Dry Plant oversize stockpile will be situated proximal to the screening tower,which is to be located at <br /> the west end of the Dry Plant facilities.Oversize material(i.e.,that greater than 1/16")from the final <br /> screening process will be stockpiled via a radial stacking conveyor unit. It is anticipated that the oversize <br /> stockpile will, at maximum capacity, encompass an approximately 55-ft diameter footprint. It is <br /> Colorado Sand Company II, LLC <br /> Kersey Mine Construction Material Regular(112)Operation Reclamation Permit Application <br /> June 7,2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.