My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-05-03_PERMIT FILE - C1980007 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2024-05-03_PERMIT FILE - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2024 8:49:22 AM
Creation date
6/6/2024 8:25:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
5/3/2024
Section_Exhibit Name
Exhibit 77 Addendum Bto Shaft
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Addendum to Exhibit 77 <br /> <br />April 24, 2024 <br /> <br /> <br />Re: Technical Revision No. TR-153 <br />Drill a 19” pilot hole from the surface at Deer Creek Shaft to the B Seam horizon to <br />allow for the construction of a B to E Seam ventilation shaft. <br /> <br />Once the 19” pilot hole is no longer needed it will be plugged and abandoned by placing an <br />appropriately sized packer down the hole to as close to the E Seam roof as possible. The hole <br />will then be backfilled with a mixture of concrete and bentonite. The casing will be cut off below <br />the surface and the soil regraded to original contour. <br /> <br />At the time the B to E Seam ventilation shaft is no longer needed, seals will be constructed in the <br />three E Seam entries to close off the shaft. These seals will remain in place indefinitely and will <br />be considered final closure. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.